Work Breakdown Structure (WBS)

A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables.

العربية

هيكل تجزئة العمل

تقسيم هرمي للنطاق الكلي للعمل الذي سينفذه فريق المشروع لتحقيق أهداف المشروع وإنشاء التسليمات المطلوبة.

Category

Scope

Standards

  • ECO 2026 — PMP Examination Content Outline 2026
  • PMBOK 7 — PMBOK Guide, 7th Edition
  • ISO 21502 — ISO 21502:2020

Source references

  • PMI, PMP Examination Content Outline (2026)
  • PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition
  • ISO 21502:2020, Project, programme and portfolio management — Guidance on project management

Cite as

EnglishAl-Sawady, B. (2026). Work Breakdown Structure. Bayhas PM Lexicon, v1. Retrieved 2026-10-29 from https://lexicon.bayhaspm.com/en/terms/work-breakdown-structure

العربيةالسوادي، ب. (2026). هيكل تجزئة العمل. معجم بيهس لإدارة المشاريع، الإصدار 1. تم الاطلاع في 2026-10-29 من https://lexicon.bayhaspm.com/ar/terms/work-breakdown-structure

CC BY 4.0·This lexicon is licensed under Creative Commons Attribution 4.0. Reuse is permitted, including commercially, as long as you credit Bayhas Al Sawady and link back.

Version date: