  "name": "Bayhas PM Lexicon",
  "name_ar": "معجم بيهس لإدارة المشاريع",
  "url": "https://lexicon.bayhaspm.com",
  "licence": "CC BY 4.0",
  "licence_url": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Al-Sawady, B. — Bayhas PM Lexicon",
  "standards": [
    "ECO 2026",
    "PMBOK 7",
    "ISO 21502"
  ],
  "taxonomy": {
    "eco_2026_domains": [
      "People",
      "Process",
      "Business Environment"
    ],
    "pmbok7_performance_domains": [
      "Stakeholder",
      "Team",
      "Development Approach and Life Cycle",
      "Planning",
      "Project Work",
      "Delivery",
      "Measurement",
      "Uncertainty"
    ],
    "approaches": [
      "predictive",
      "adaptive",
      "hybrid",
      "universal"
    ]
  },
  "generated_at": "2026-10-29T15:30:56.118Z",
  "count": 170,
  "terms": [
    {
      "slug": "acceptance-criteria",
      "term_en": "Acceptance Criteria",
      "term_ar": "معايير القبول",
      "abbreviation": null,
      "definition_en": "A set of conditions that is required to be met before deliverables are accepted.",
      "definition_ar": "مجموعة من الشروط التي يجب تحقيقها قبل قبول التسليمات.",
      "synonyms_en": [
        "completion criteria"
      ],
      "synonyms_ar": [
        "معايير الإنجاز، معايير الاستلام"
      ],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7",
        "Section 5.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-09-05",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/acceptance-criteria",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/acceptance-criteria"
    },
    {
      "slug": "accepted-deliverable",
      "term_en": "Accepted Deliverable",
      "term_ar": "التسليم المقبول",
      "abbreviation": null,
      "definition_en": "A deliverable that has been formally signed off and approved by the customer or sponsor.",
      "definition_ar": "تسليم تمت الموافقة عليه رسمياً وتوقيعه من قبل العميل أو الراعي.",
      "synonyms_en": [
        "signed-off deliverable"
      ],
      "synonyms_ar": [
        "تسليم موقع عليه"
      ],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 5.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/accepted-deliverable",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/accepted-deliverable"
    },
    {
      "slug": "active-listening",
      "term_en": "Active Listening",
      "term_ar": "الاستماع الفعال",
      "abbreviation": null,
      "definition_en": "A communication technique that requires the listener to provide feedback on what they hear to confirm understanding.",
      "definition_ar": "تقنية اتصال تتطلب من المستمع تقديم تغذية راجعة عما يسمعه لتأكيد الفهم.",
      "synonyms_en": [
        "reflective listening"
      ],
      "synonyms_ar": [
        "الاستماع الانعكاسي"
      ],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 10.1.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/active-listening",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/active-listening"
    },
    {
      "slug": "activity-attributes",
      "term_en": "Activity Attributes",
      "term_ar": "سمات النشاط",
      "abbreviation": null,
      "definition_en": "Multiple attributes associated with each schedule activity that can be included within the activity list.",
      "definition_ar": "سمات متعددة مرتبطة بكل نشاط جدولة يمكن تضمينها في قائمة الأنشطة.",
      "synonyms_en": [
        "activity details"
      ],
      "synonyms_ar": [
        "تفاصيل النشاط"
      ],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 6.2.3.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/activity-attributes",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/activity-attributes"
    },
    {
      "slug": "activity-list",
      "term_en": "Activity List",
      "term_ar": "قائمة الأنشطة",
      "abbreviation": null,
      "definition_en": "A documented tabulation of schedule activities that shows the activity description, identifier, and a sufficiently detailed scope of work description.",
      "definition_ar": "جداول موثقة لأنشطة الجدولة توضح وصف النشاط والمعرف ووصفاً كافياً لنطاق العمل.",
      "synonyms_en": [
        "activity register"
      ],
      "synonyms_ar": [
        "سجل الأنشطة"
      ],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 6.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/activity-list",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/activity-list"
    },
    {
      "slug": "actual-cost",
      "term_en": "Actual Cost",
      "term_ar": "التكلفة الفعلية",
      "abbreviation": "AC",
      "definition_en": "The realized cost incurred for the work performed on an activity during a specific time period.",
      "definition_ar": "التكلفة الفعلية التي تم تكبدها للعمل المنجز على نشاط خلال فترة زمنية محددة.",
      "synonyms_en": [
        "AC",
        "actual cost of work performed"
      ],
      "synonyms_ar": [
        "التكلفة الفعلية"
      ],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 7.4.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/actual-cost",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/actual-cost"
    },
    {
      "slug": "agreement",
      "term_en": "Agreement",
      "term_ar": "الاتفاقية",
      "abbreviation": null,
      "definition_en": "A mutually binding document that obligates the seller to provide specified products or services and obligates the buyer to pay for them.",
      "definition_ar": "وثيقة ملزمة متبادلة تلزم البائع بتقديم منتجات أو خدمات محددة وتلزم المشتري بدفع ثمنها.",
      "synonyms_en": [
        "contract"
      ],
      "synonyms_ar": [
        "العقد"
      ],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 12.2.3.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/agreement",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/agreement"
    },
    {
      "slug": "analogous-estimating",
      "term_en": "Analogous Estimating",
      "term_ar": "التقدير المماثل",
      "abbreviation": null,
      "definition_en": "A technique for estimating the duration or cost of an activity or project using historical data from a similar activity or project.",
      "definition_ar": "تقنية لتقدير مدة أو تكلفة نشاط أو مشروع باستخدام بيانات تاريخية من نشاط أو مشروع مماثل.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/analogous-estimating",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/analogous-estimating"
    },
    {
      "slug": "appraisal-cost",
      "term_en": "Appraisal Cost",
      "term_ar": "تكلفة الفحص",
      "abbreviation": null,
      "definition_en": "The cost of evaluating, measuring, auditing, and testing products or services to assure conformance to requirements.",
      "definition_ar": "تكلفة تقييم وقياس ومراجعة واختبار المنتجات أو الخدمات لضمان مطابقتها للمتطلبات.",
      "synonyms_en": [
        "inspection cost"
      ],
      "synonyms_ar": [
        "تكلفة التقييم"
      ],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 8.1.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/appraisal-cost",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/appraisal-cost"
    },
    {
      "slug": "assumption",
      "term_en": "Assumption",
      "term_ar": "الافتراض",
      "abbreviation": null,
      "definition_en": "A factor in the planning process that is considered to be true, real, or certain, without proof or demonstration.",
      "definition_ar": "عامل في عملية التخطيط يُعتبر صحيحاً أو حقيقياً أو مؤكداً دون إثبات أو برهان.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/assumption",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/assumption"
    },
    {
      "slug": "baseline",
      "term_en": "Baseline",
      "term_ar": "خط الأساس",
      "abbreviation": null,
      "definition_en": "The approved version of a work product that can be changed only through formal change control procedures.",
      "definition_ar": "النسخة المعتمدة من منتج العمل التي لا يمكن تغييرها إلا من خلال إجراءات التحكم الرسمية في التغيير.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/baseline",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/baseline"
    },
    {
      "slug": "basis-of-estimates",
      "term_en": "Basis of Estimates",
      "term_ar": "أساس التقديرات",
      "abbreviation": null,
      "definition_en": "Documentation of the basis of the cost or duration estimates, including how they were developed and the confidence level.",
      "definition_ar": "توثيق أساس تقديرات التكلفة أو المدة، بما في ذلك كيفية تطويرها ومستوى الثقة.",
      "synonyms_en": [
        "estimate basis"
      ],
      "synonyms_ar": [
        "أساس التقدير"
      ],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 7.2.3.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/basis-of-estimates",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/basis-of-estimates"
    },
    {
      "slug": "benchmarking",
      "term_en": "Benchmarking",
      "term_ar": "المقارنة المعيارية",
      "abbreviation": null,
      "definition_en": "The comparison of actual or planned products, processes, and practices to those of comparable organizations.",
      "definition_ar": "مقارنة المنتجات أو العمليات أو الممارسات الفعلية أو المخطط بها مع تلك الخاصة بالمنظمات المماثلة.",
      "synonyms_en": [
        "benchmark"
      ],
      "synonyms_ar": [
        "المعيار المرجعي"
      ],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 8.1.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/benchmarking",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/benchmarking"
    },
    {
      "slug": "benefits-management-plan",
      "term_en": "Benefits Management Plan",
      "term_ar": "خطة إدارة المنافع",
      "abbreviation": null,
      "definition_en": "A document that describes how and when the benefits of a project or program will be delivered and measured.",
      "definition_ar": "وثيقة تصف كيف ومتى سيتم تسليم وقياس منافع المشروع أو البرنامج.",
      "synonyms_en": [
        "benefits realization plan"
      ],
      "synonyms_ar": [
        "خطة تحقيق المنافع"
      ],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 1.2.6"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/benefits-management-plan",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/benefits-management-plan"
    },
    {
      "slug": "bidder-conference",
      "term_en": "Bidder Conference",
      "term_ar": "مؤتمر البائعين",
      "abbreviation": null,
      "definition_en": "A meeting with prospective sellers prior to the preparation of a bid or proposal to ensure that all have a clear understanding of the procurement requirements.",
      "definition_ar": "اجتماع مع البائعين المحتملين قبل إعداد العرض أو المقترح لضمان فهم الجميع لمتطلبات المشتريات.",
      "synonyms_en": [
        "vendor conference"
      ],
      "synonyms_ar": [
        "مؤتمر الموردين"
      ],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 12.2.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/bidder-conference",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/bidder-conference"
    },
    {
      "slug": "bottom-up-estimating",
      "term_en": "Bottom-Up Estimating",
      "term_ar": "التقدير من أسفل إلى أعلى",
      "abbreviation": null,
      "definition_en": "A method of estimating project duration or cost by aggregating the estimates of lower-level components.",
      "definition_ar": "طريقة لتقدير مدة المشروع أو تكلفته من خلال تجميع تقديرات المكونات ذات المستوى الأدنى.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/bottom-up-estimating",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/bottom-up-estimating"
    },
    {
      "slug": "budget-at-completion",
      "term_en": "Budget at Completion",
      "term_ar": "الميزانية عند الاكتمال",
      "abbreviation": "BAC",
      "definition_en": "The sum of all budgets established for the work to be performed.",
      "definition_ar": "مجموع جميع الميزانيات المحددة للعمل المطلوب تنفيذه.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/budget-at-completion",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/budget-at-completion"
    },
    {
      "slug": "business-case",
      "term_en": "Business Case",
      "term_ar": "دراسة الجدوى",
      "abbreviation": null,
      "definition_en": "A documented economic feasibility study used to establish the validity of the benefits of a selected component lacking sufficient definition.",
      "definition_ar": "دراسة جدوى اقتصادية موثقة تُستخدم لتأسيس صحة منافع المكون المختار الذي يفتقر إلى تعريف كافٍ.",
      "synonyms_en": [
        "feasibility study",
        "justification"
      ],
      "synonyms_ar": [
        "دراسة الجدوى الاقتصادية"
      ],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 1.2.6"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/business-case",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/business-case"
    },
    {
      "slug": "business-value",
      "term_en": "Business Value",
      "term_ar": "القيمة التجارية",
      "abbreviation": null,
      "definition_en": "The net quantifiable benefit derived from a business endeavor that may be tangible, intangible, or both.",
      "definition_ar": "المنفعة القابلة للقياس الصافية المستمدة من المجهود التجاري والتي قد تكون ملموسة أو غير ملموسة أو كليهما.",
      "synonyms_en": [
        "value"
      ],
      "synonyms_ar": [
        "القيمة"
      ],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 1.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/business-value",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/business-value"
    },
    {
      "slug": "cause-and-effect-diagram",
      "term_en": "Cause and Effect Diagram",
      "term_ar": "مخطط السبب والنتيجة",
      "abbreviation": null,
      "definition_en": "A decomposition technique that helps trace an undesirable effect back to its root cause. Also known as fishbone or Ishikawa diagram.",
      "definition_ar": "تقنية تحليل تساعد في تتبع تأثير غير مرغوب فيه للوصول إلى سببه الجذري. يُعرف أيضاً بمخطط عظمة السمكة أو مخطط إيشيكاوا.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/cause-and-effect-diagram",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/cause-and-effect-diagram"
    },
    {
      "slug": "change-control",
      "term_en": "Change Control",
      "term_ar": "التحكم في التغييرات",
      "abbreviation": null,
      "definition_en": "A process whereby all change requests are reviewed and approved or rejected by a responsible authority.",
      "definition_ar": "عملية يتم فيها مراجعة جميع طلبات التغيير واعتمادها أو رفضها من قبل سلطة مسؤولة.",
      "synonyms_en": [
        "change management"
      ],
      "synonyms_ar": [
        "إدارة التغيير"
      ],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 4.6"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/change-control",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/change-control"
    },
    {
      "slug": "change-control-board",
      "term_en": "Change Control Board",
      "term_ar": "مجلس التحكم في التغييرات",
      "abbreviation": "CCB",
      "definition_en": "A formally chartered group responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project.",
      "definition_ar": "مجموعة معتمدة رسمياً مسؤولة عن مراجعة وتقييم واعتماد أو تأخير أو رفض التغييرات في المشروع.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/change-control-board",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/change-control-board"
    },
    {
      "slug": "change-request",
      "term_en": "Change Request",
      "term_ar": "طلب التغيير",
      "abbreviation": null,
      "definition_en": "A formal proposal to modify any document, deliverable, or baseline.",
      "definition_ar": "اقتراح رسمي لتعديل أي وثيقة أو تسليم أو خط أساس.",
      "synonyms_en": [
        "modification request"
      ],
      "synonyms_ar": [
        "طلب التعديل"
      ],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 4.6"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/change-request",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/change-request"
    },
    {
      "slug": "claims-administration",
      "term_en": "Claims Administration",
      "term_ar": "إدارة المطالبات",
      "abbreviation": null,
      "definition_en": "The process of processing, adjudicating, and communicating contract claims between the buyer and seller.",
      "definition_ar": "عملية معالجة وتسويق وإبلاغ مطالبات العقد بين المشتري والبائع.",
      "synonyms_en": [
        "claim management"
      ],
      "synonyms_ar": [
        "إدارة المطالبات"
      ],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 12.3.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/claims-administration",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/claims-administration"
    },
    {
      "slug": "closed-procurements",
      "term_en": "Closed Procurements",
      "term_ar": "المشتريات المغلقة",
      "abbreviation": null,
      "definition_en": "Procurements that have been completed and formally closed in accordance with the terms of the agreement.",
      "definition_ar": "المشتريات التي اكتملت وأُغلقت رسمياً وفقاً لشروط الاتفاقية.",
      "synonyms_en": [
        "completed contracts"
      ],
      "synonyms_ar": [
        "العقود المكتملة"
      ],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 12.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/closed-procurements",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/closed-procurements"
    },
    {
      "slug": "communication-methods",
      "term_en": "Communication Methods",
      "term_ar": "طرق الاتصال",
      "abbreviation": null,
      "definition_en": "The approaches used to exchange information, including interactive, push, and pull communication.",
      "definition_ar": "الأساليب المستخدمة لتبادل المعلومات، بما في ذلك الاتصال التفاعلي والدفعي والسحبي.",
      "synonyms_en": [
        "communication channels"
      ],
      "synonyms_ar": [
        "قنوات الاتصال"
      ],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 10.1.2.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/communication-methods",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/communication-methods"
    },
    {
      "slug": "communication-requirements-analysis",
      "term_en": "Communication Requirements Analysis",
      "term_ar": "تحليل متطلبات الاتصال",
      "abbreviation": null,
      "definition_en": "A technique to determine the information needs of project stakeholders through interviews, workshops, and document analysis.",
      "definition_ar": "تقنية لتحديد احتياجات المعلومات لأصحاب المصلحة في المشروع من خلال المقابلات وورش العمل وتحليل الوثائق.",
      "synonyms_en": [
        "stakeholder information needs analysis"
      ],
      "synonyms_ar": [
        "تحليل احتياجات المعلومات"
      ],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 10.1.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/communication-requirements-analysis",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/communication-requirements-analysis"
    },
    {
      "slug": "communication-styles-assessment",
      "term_en": "Communication Styles Assessment",
      "term_ar": "تقييم أساليب الاتصال",
      "abbreviation": null,
      "definition_en": "A technique to evaluate how stakeholders prefer to send and receive information to tailor communications effectively.",
      "definition_ar": "تقنية لتقييم كيفية تفضيل أصحاب المصلحة إرسال واستلام المعلومات لتخصيص الاتصالات بفعالية.",
      "synonyms_en": [
        "communication preferences"
      ],
      "synonyms_ar": [
        "تفضيلات الاتصال"
      ],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 13.2.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/communication-styles-assessment",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/communication-styles-assessment"
    },
    {
      "slug": "communication-technology",
      "term_en": "Communication Technology",
      "term_ar": "تقنية الاتصال",
      "abbreviation": null,
      "definition_en": "The tools, techniques, and methods used to transfer information among project stakeholders.",
      "definition_ar": "الأدوات والتقنيات والطرق المستخدمة لنقل المعلومات بين أصحاب المصلحة في المشروع.",
      "synonyms_en": [
        "communication tools"
      ],
      "synonyms_ar": [
        "أدوات الاتصال"
      ],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 10.1.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/communication-technology",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/communication-technology"
    },
    {
      "slug": "communications-management-plan",
      "term_en": "Communications Management Plan",
      "term_ar": "خطة إدارة الاتصالات",
      "abbreviation": null,
      "definition_en": "A component of the project management plan that describes how, when, and by whom information about the project will be administered and disseminated.",
      "definition_ar": "مكون من خطة إدارة المشروع يصف كيف ومتى ومن سيدير ​​وينشر المعلومات المتعلقة بالمشروع.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/communications-management-plan",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/communications-management-plan"
    },
    {
      "slug": "configuration-management",
      "term_en": "Configuration Management",
      "term_ar": "إدارة التكوين",
      "abbreviation": null,
      "definition_en": "A collection of formal activities used to apply technical and administrative direction and surveillance to identify and document functional and physical characteristics.",
      "definition_ar": "مجموعة من الأنشطة الرسمية المستخدمة لتطبيق التوجيه والمراقبة الفنية والإدارية لتحديد وتوثيق الخصائص الوظيفية والفيزيائية.",
      "synonyms_en": [
        "configuration control"
      ],
      "synonyms_ar": [
        "التحكم في التكوين"
      ],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 4.6"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/configuration-management",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/configuration-management"
    },
    {
      "slug": "conflict-management",
      "term_en": "Conflict Management",
      "term_ar": "إدارة الصراع",
      "abbreviation": null,
      "definition_en": "The process of handling disagreements and conflicts among project stakeholders in a constructive manner.",
      "definition_ar": "عملية التعامل مع الخلافات والصراعات بين أصحاب المصلحة في المشروع بطريقة بناءة.",
      "synonyms_en": [
        "dispute resolution"
      ],
      "synonyms_ar": [
        "حل النزاعات"
      ],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 9.5.2.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/conflict-management",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/conflict-management"
    },
    {
      "slug": "constraint",
      "term_en": "Constraint",
      "term_ar": "القيد",
      "abbreviation": null,
      "definition_en": "A limiting factor that affects the execution of a project, program, portfolio, or process.",
      "definition_ar": "عامل مقيد يؤثر على تنفيذ مشروع أو برنامج أو محفظة أو عملية.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/constraint",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/constraint"
    },
    {
      "slug": "contingency-reserve",
      "term_en": "Contingency Reserve",
      "term_ar": "احتياطي الطوارئ",
      "abbreviation": null,
      "definition_en": "Budget within the cost baseline or performance measurement baseline allocated for identified risks that are accepted.",
      "definition_ar": "ميزانية ضمن خط الأساس للتكلفة أو خط الأساس لقياس الأداء مخصصة للمخاطر المحددة والمقبولة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/contingency-reserve",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/contingency-reserve"
    },
    {
      "slug": "control-chart",
      "term_en": "Control Chart",
      "term_ar": "مخطط التحكم",
      "abbreviation": null,
      "definition_en": "A graphic display of process data over time and against established control limits, used to determine if the process is within acceptable limits.",
      "definition_ar": "عرض رسومي لبيانات العملية بمرور الوقت مقارنة بحدود التحكم المحددة، يُستخدم لتحديد ما إذا كانت العملية ضمن الحدود المقبولة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/control-chart",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/control-chart"
    },
    {
      "slug": "corrective-action",
      "term_en": "Corrective Action",
      "term_ar": "الإجراء التصحيحي",
      "abbreviation": null,
      "definition_en": "An intentional activity that realigns the performance of the project work with the project management plan.",
      "definition_ar": "نشاط مقصود يعيد أداء عمل المشروع إلى التوافق مع خطة إدارة المشروع.",
      "synonyms_en": [
        "remediation"
      ],
      "synonyms_ar": [
        "علاج"
      ],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 4.3.3.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/corrective-action",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/corrective-action"
    },
    {
      "slug": "cost-baseline",
      "term_en": "Cost Baseline",
      "term_ar": "خط الأساس للتكلفة",
      "abbreviation": null,
      "definition_en": "The approved version of the time-phased project budget, excluding any management reserves.",
      "definition_ar": "النسخة المعتمدة من ميزانية المشروع حسب مراحلها الزمنية، باستثناء أي احتياطيات إدارية.",
      "synonyms_en": [
        "time-phased budget"
      ],
      "synonyms_ar": [
        "الميزانية حسب المراحل الزمنية"
      ],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 7.3.3.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/cost-baseline",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/cost-baseline"
    },
    {
      "slug": "cost-estimate",
      "term_en": "Cost Estimate",
      "term_ar": "تقدير التكلفة",
      "abbreviation": null,
      "definition_en": "A quantitative assessment of the likely costs for resources required to complete schedule activities.",
      "definition_ar": "تقييم كمي للتكاليف المحتملة للموارد المطلوبة لإكمال أنشطة الجدولة.",
      "synonyms_en": [
        "estimate"
      ],
      "synonyms_ar": [
        "التقدير"
      ],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 7.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/cost-estimate",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/cost-estimate"
    },
    {
      "slug": "cost-of-quality",
      "term_en": "Cost of Quality",
      "term_ar": "تكلفة الجودة",
      "abbreviation": "COQ",
      "definition_en": "All costs incurred over the life of the product by investment in preventing nonconformance to requirements and appraising the product.",
      "definition_ar": "جميع التكاليف التي تُتكبد طوال عمر المنتج من خلال الاستثمار في منع عدم المطابقة للمتطلبات وتقييم المنتج.",
      "synonyms_en": [
        "COQ",
        "quality costs"
      ],
      "synonyms_ar": [
        "تكاليف الجودة"
      ],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 8.1.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/cost-of-quality",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/cost-of-quality"
    },
    {
      "slug": "cost-performance-index",
      "term_en": "Cost Performance Index",
      "term_ar": "مؤشر أداء التكلفة",
      "abbreviation": "CPI",
      "definition_en": "A measure of the cost efficiency of budgeted resources expressed as the ratio of earned value to actual cost.",
      "definition_ar": "مقياس لكفاءة تكلفة الموارد المخصصة في الميزانية يُعبّر عنه بنسبة القيمة المكتسبة إلى التكلفة الفعلية.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/cost-performance-index",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/cost-performance-index"
    },
    {
      "slug": "cost-variance",
      "term_en": "Cost Variance",
      "term_ar": "تباين التكلفة",
      "abbreviation": "CV",
      "definition_en": "The amount of budget deficit or surplus at a given point in time, expressed as the difference between earned value and actual cost.",
      "definition_ar": "مقدار العجز أو الفائض في الميزانية في نقطة زمنية معينة، يُعبّر عنه بالفرق بين القيمة المكتسبة والتكلفة الفعلية.",
      "synonyms_en": [
        "CV"
      ],
      "synonyms_ar": [
        "تباين التكلفة"
      ],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 7.4.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/cost-variance",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/cost-variance"
    },
    {
      "slug": "cost-reimbursable-contract",
      "term_en": "Cost-Reimbursable Contract",
      "term_ar": "عقد استرداد التكاليف",
      "abbreviation": null,
      "definition_en": "A type of contract involving payment to the seller for the seller's actual costs, plus a fee typically representing seller's profit.",
      "definition_ar": "نوع من العقود يتضمن الدفع للبائع مقابل تكاليفه الفعلية، بالإضافة إلى رسوم تمثل عادةً ربح البائع.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/cost-reimbursable-contract",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/cost-reimbursable-contract"
    },
    {
      "slug": "crashing",
      "term_en": "Crashing",
      "term_ar": "الاختصار/التكثيف",
      "abbreviation": null,
      "definition_en": "A technique used to shorten the schedule duration for the least incremental cost by adding resources.",
      "definition_ar": "تقنية تُستخدم لتقليص مدة الجدول الزمني بأقل تكلفة إضافية عن طريق إضافة الموارد.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/crashing",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/crashing"
    },
    {
      "slug": "critical-path-method",
      "term_en": "Critical Path Method",
      "term_ar": "طريقة المسار الحرج",
      "abbreviation": "CPM",
      "definition_en": "A method used to estimate the minimum project duration and determine the amount of scheduling flexibility on the logical network paths within the schedule model.",
      "definition_ar": "طريقة تُستخدم لتقدير الحد الأدنى لمدة المشروع وتحديد مقدار المرونة في الجدولة على مسارات الشبكة المنطقية داخل نموذج الجدول.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/critical-path-method",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/critical-path-method"
    },
    {
      "slug": "cultural-awareness",
      "term_en": "Cultural Awareness",
      "term_ar": "الوعي الثقافي",
      "abbreviation": null,
      "definition_en": "The understanding of how cultural differences among stakeholders can affect project communications and interactions.",
      "definition_ar": "فهم كيفية تأثير الاختلافات الثقافية بين أصحاب المصلحة على اتصالات المشروع وتفاعلاته.",
      "synonyms_en": [
        "cultural sensitivity"
      ],
      "synonyms_ar": [
        "الحساسية الثقافية"
      ],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 3.4.5.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/cultural-awareness",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/cultural-awareness"
    },
    {
      "slug": "decomposition",
      "term_en": "Decomposition",
      "term_ar": "التجزئة",
      "abbreviation": null,
      "definition_en": "A technique used for dividing and subdividing the project scope and project deliverables into smaller, more manageable parts.",
      "definition_ar": "تقنية تُستخدم لتقسيم نطاق المشروع وتسليماته إلى أجزاء أصغر وأكثر قابلية للإدارة.",
      "synonyms_en": [
        "breakdown"
      ],
      "synonyms_ar": [
        "التقسيم"
      ],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 5.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/decomposition",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/decomposition"
    },
    {
      "slug": "defect-repair",
      "term_en": "Defect Repair",
      "term_ar": "إصلاح العيب",
      "abbreviation": null,
      "definition_en": "An intentional activity to modify a nonconforming product or product component.",
      "definition_ar": "نشاط مقصود لتعديل منتج أو مكون منتج غير مطابق للمواصفات.",
      "synonyms_en": [
        "defect remediation"
      ],
      "synonyms_ar": [
        "معالجة العيب"
      ],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 4.3.3.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/defect-repair",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/defect-repair"
    },
    {
      "slug": "deliverable",
      "term_en": "Deliverable",
      "term_ar": "التسليم",
      "abbreviation": null,
      "definition_en": "Any unique and verifiable product, result, or capability to perform a service that is required to be produced to complete a process, phase, or project.",
      "definition_ar": "أي منتج أو نتيجة أو قدرة فريدة وقابلة للتحقق على أداء خدمة مطلوب إنتاجها لإتمام عملية أو مرحلة أو مشروع.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI",
        "PMP Examination Content Outline (2026)",
        "PMI",
        "A Guide to the Project Management Body of Knowledge (PMBOK Guide)",
        "7th Edition",
        "ISO 21502:2020",
        "Project",
        "programme and portfolio management — Guidance on project management"
      ],
      "notes_en": "An output of the phase, process, or project that will be subject to acceptance by the customer",
      "notes_ar": "مخرجات العملية أو المرحلة أو المشروع التي سيتم استلامها من العميل",
      "version": 1,
      "updated": "2026-09-05",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/deliverable",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/deliverable"
    },
    {
      "slug": "direction-of-influence",
      "term_en": "Direction of Influence",
      "term_ar": "اتجاه التأثير",
      "abbreviation": null,
      "definition_en": "A stakeholder classification approach that groups stakeholders according to their ability to influence the project from above, below, sideways, or externally.",
      "definition_ar": "نهج لتصنيف أصحاب المصلحة يجمعهم وفقاً لقدرتهم على التأثير في المشروع من أعلى أو أسفل أو جانبياً أو خارجياً.",
      "synonyms_en": [
        "influence direction"
      ],
      "synonyms_ar": [
        "جهة التأثير"
      ],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 13.1.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/direction-of-influence",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/direction-of-influence"
    },
    {
      "slug": "early-finish",
      "term_en": "Early Finish",
      "term_ar": "النهاية المبكرة",
      "abbreviation": "EF",
      "definition_en": "The earliest possible point in time when the uncompleted portions of a schedule activity can finish.",
      "definition_ar": "أقرب نقطة زمنية ممكنة يمكن أن تنتهي فيها الأجزاء غير المكتملة من نشاط الجدولة.",
      "synonyms_en": [
        "EF"
      ],
      "synonyms_ar": [
        "النهاية المبكرة"
      ],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 6.5.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/early-finish",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/early-finish"
    },
    {
      "slug": "early-start",
      "term_en": "Early Start",
      "term_ar": "البداية المبكرة",
      "abbreviation": "ES",
      "definition_en": "The earliest possible point in time when the uncompleted portions of a schedule activity can start.",
      "definition_ar": "أقرب نقطة زمنية ممكنة يمكن أن تبدأ فيها الأجزاء غير المكتملة من نشاط الجدولة.",
      "synonyms_en": [
        "ES"
      ],
      "synonyms_ar": [
        "البداية المبكرة"
      ],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 6.5.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/early-start",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/early-start"
    },
    {
      "slug": "earned-value",
      "term_en": "Earned Value",
      "term_ar": "القيمة المكتسبة",
      "abbreviation": "EV",
      "definition_en": "The measure of work performed expressed in terms of the budget authorized for that work.",
      "definition_ar": "مقياس العمل المنجز يُعبر عنه بالميزانية المعتمدة لهذا العمل.",
      "synonyms_en": [
        "EV",
        "budgeted cost of work performed"
      ],
      "synonyms_ar": [
        "القيمة المكتسبة"
      ],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 7.4.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/earned-value",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/earned-value"
    },
    {
      "slug": "earned-value-management",
      "term_en": "Earned Value Management",
      "term_ar": "إدارة القيمة المكتسبة",
      "abbreviation": "EVM",
      "definition_en": "A methodology that combines scope, schedule, and resource measurements to assess project performance and progress.",
      "definition_ar": "منهجية تجمع بين قياسات النطاق والجدول الزمني والموارد لتقييم أداء المشروع وتقدمه.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/earned-value-management",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/earned-value-management"
    },
    {
      "slug": "emotional-intelligence",
      "term_en": "Emotional Intelligence",
      "term_ar": "الذكاء العاطفي",
      "abbreviation": "EQ",
      "definition_en": "The ability to identify, assess, and manage the personal emotions of oneself and other people, as well as of groups.",
      "definition_ar": "القدرة على تحديد وتقييم وإدارة المشاعر الشخصية لذاتك والآخرين وكذلك المجموعات.",
      "synonyms_en": [
        "EQ",
        "emotional quotient"
      ],
      "synonyms_ar": [
        "الذكاء العاطفي"
      ],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 3.4.5.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/emotional-intelligence",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/emotional-intelligence"
    },
    {
      "slug": "engagement-level",
      "term_en": "Engagement Level",
      "term_ar": "مستوى الإشراك",
      "abbreviation": null,
      "definition_en": "The degree to which a stakeholder is actively involved with and supportive of the project, ranging from unaware to leading.",
      "definition_ar": "درجة مشاركة صاحب المصلحة الفعالة ودعمه للمشروع، تتراوح من غير مدرك إلى قيادي.",
      "synonyms_en": [
        "stakeholder engagement level"
      ],
      "synonyms_ar": [
        "مستوى مشاركة أصحاب المصلحة"
      ],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 13.2.2.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/engagement-level",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/engagement-level"
    },
    {
      "slug": "enterprise-environmental-factors",
      "term_en": "Enterprise Environmental Factors",
      "term_ar": "العوامل البيئية المؤسسية",
      "abbreviation": null,
      "definition_en": "Conditions that are not under the immediate control of the team that influence, constrain, or direct the project.",
      "definition_ar": "الظروف التي لا تقع تحت السيطرة المباشرة للفريق والتي تؤثر على المشروع أو تقيده أو توجهه.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/enterprise-environmental-factors",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/enterprise-environmental-factors"
    },
    {
      "slug": "estimate-at-completion",
      "term_en": "Estimate at Completion",
      "term_ar": "التقدير عند الاكتمال",
      "abbreviation": "EAC",
      "definition_en": "The expected total cost of completing all work expressed as the sum of the actual cost to date and the estimate to complete.",
      "definition_ar": "إجمالي التكلفة المتوقعة لإتمام جميع الأعمال يُعبّر عنها بمجموع التكلفة الفعلية حتى الآن وتقدير الإتمام.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/estimate-at-completion",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/estimate-at-completion"
    },
    {
      "slug": "estimate-to-complete",
      "term_en": "Estimate to Complete",
      "term_ar": "تقدير الإتمام",
      "abbreviation": "ETC",
      "definition_en": "The expected cost to finish all the remaining project work.",
      "definition_ar": "التكلفة المتوقعة لإنهاء جميع أعمال المشروع المتبقية.",
      "synonyms_en": [
        "ETC"
      ],
      "synonyms_ar": [
        "تقدير الإتمام"
      ],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 7.4.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/estimate-to-complete",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/estimate-to-complete"
    },
    {
      "slug": "expected-monetary-value",
      "term_en": "Expected Monetary Value",
      "term_ar": "القيمة النقدية المتوقعة",
      "abbreviation": "EMV",
      "definition_en": "The product of an event's probability of occurrence and the value of its impact, used to quantify risks.",
      "definition_ar": "حاصل ضرب احتمالية حدوث الحدث في قيمة تأثيره، يُستخدم لتحديد المخاطر كمياً.",
      "synonyms_en": [
        "EMV"
      ],
      "synonyms_ar": [
        "القيمة المتوقعة"
      ],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 11.4.2.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/expected-monetary-value",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/expected-monetary-value"
    },
    {
      "slug": "failure-cost",
      "term_en": "Failure Cost",
      "term_ar": "تكلفة الفشل",
      "abbreviation": null,
      "definition_en": "The cost resulting from products or services not conforming to requirements or customer needs.",
      "definition_ar": "التكلفة الناتجة عن عدم مطابقة المنتجات أو الخدمات للمتطلبات أو احتياجات العملاء.",
      "synonyms_en": [
        "cost of poor quality"
      ],
      "synonyms_ar": [
        "تكلفة الجودة الرديئة"
      ],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 8.1.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/failure-cost",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/failure-cost"
    },
    {
      "slug": "fallback-plan",
      "term_en": "Fallback Plan",
      "term_ar": "الخطة البديلة",
      "abbreviation": null,
      "definition_en": "A plan that is implemented if a selected risk response strategy is not fully effective or an accepted risk occurs.",
      "definition_ar": "خطة يتم تنفيذها إذا كانت استراتيجية الاستجابة للمخاطر المختارة غير فعالة تماماً أو إذا حدثت مخاطرة مقبولة.",
      "synonyms_en": [
        "contingency plan"
      ],
      "synonyms_ar": [
        "خطة الطوارئ"
      ],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 11.5.2.6"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/fallback-plan",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/fallback-plan"
    },
    {
      "slug": "fast-tracking",
      "term_en": "Fast Tracking",
      "term_ar": "التتبع السريع",
      "abbreviation": null,
      "definition_en": "A schedule compression technique in which activities or phases normally done in sequence are performed in parallel for at least a portion of their duration.",
      "definition_ar": "تقنية ضغط الجدول الزمني يتم فيها تنفيذ الأنشطة أو المراحل التي تُنفذ عادةً بالتتابع بشكل متوازٍ لجزء على الأقل من مدتها.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/fast-tracking",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/fast-tracking"
    },
    {
      "slug": "feedback",
      "term_en": "Feedback",
      "term_ar": "التغذية الراجعة",
      "abbreviation": null,
      "definition_en": "Information about reactions to a product, a person's performance, or a process, used as a basis for improvement.",
      "definition_ar": "معلومات حول ردود الفعل تجاه منتج أو أداء شخص أو عملية، تُستخدم كأساس للتحسين.",
      "synonyms_en": [
        "response"
      ],
      "synonyms_ar": [
        "الرد"
      ],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 10.1.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/feedback",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/feedback"
    },
    {
      "slug": "fixed-price-contract",
      "term_en": "Fixed Price Contract",
      "term_ar": "عقد السعر الثابت",
      "abbreviation": null,
      "definition_en": "A type of contract involving a set total price for a defined product, service, or result.",
      "definition_ar": "نوع من العقود يتضمن سعراً إجمالياً محدداً لمنتج أو خدمة أو نتيجة محددة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/fixed-price-contract",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/fixed-price-contract"
    },
    {
      "slug": "float",
      "term_en": "Float",
      "term_ar": "الوقت العائم/المرونة",
      "abbreviation": "Slack",
      "definition_en": "The amount of time an activity can be delayed from its early start without delaying the project finish date.",
      "definition_ar": "مقدار الوقت الذي يمكن فيه تأخير نشاط ما من بدايته المبكرة دون تأخير تاريخ انتهاء المشروع.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/float",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/float"
    },
    {
      "slug": "funding-limit-reconciliation",
      "term_en": "Funding Limit Reconciliation",
      "term_ar": "التوفيق بين حدود التمويل",
      "abbreviation": null,
      "definition_en": "The comparison of the planned expenditure of project funds against any funding limits set for the project.",
      "definition_ar": "مقارنة الإنفاق المخطط لأموال المشروع مع أي حدود تمويل محددة للمشروع.",
      "synonyms_en": [
        "funding reconciliation"
      ],
      "synonyms_ar": [
        "توفيق التمويل"
      ],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 7.3.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/funding-limit-reconciliation",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/funding-limit-reconciliation"
    },
    {
      "slug": "gantt-chart",
      "term_en": "Gantt Chart",
      "term_ar": "مخطط جانت",
      "abbreviation": null,
      "definition_en": "A bar chart of schedule information where activities are listed on the vertical axis, dates are shown on the horizontal axis, and activity durations are shown as horizontal bars.",
      "definition_ar": "مخطط شريطي لمعلومات الجدول الزمني حيث تُدرج الأنشطة على المحور الرأسي والتواريخ على المحور الأفقي ومدد الأنشطة كأشرطة أفقية.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/gantt-chart",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/gantt-chart"
    },
    {
      "slug": "gold-plating",
      "term_en": "Gold Plating",
      "term_ar": "التذهيب/الإضافات غير المطلوبة",
      "abbreviation": null,
      "definition_en": "Adding extra features or functionality to a product or service without customer request or formal approval.",
      "definition_ar": "إضافة ميزات أو وظائف إضافية للمنتج أو الخدمة دون طلب من العميل أو موافقة رسمية.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/gold-plating",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/gold-plating"
    },
    {
      "slug": "governance",
      "term_en": "Governance",
      "term_ar": "الحوكمة",
      "abbreviation": null,
      "definition_en": "The framework, functions, and processes that guide project management activities to create value and meet organizational objectives.",
      "definition_ar": "الإطار والوظائف والعمليات التي توجه أنشطة إدارة المشاريع لخلق قيمة وتحقيق أهداف المنظمة.",
      "synonyms_en": [
        "project governance"
      ],
      "synonyms_ar": [
        "حوكمة المشروع"
      ],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/governance",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/governance"
    },
    {
      "slug": "independent-estimates",
      "term_en": "Independent Estimates",
      "term_ar": "التقديرات المستقلة",
      "abbreviation": null,
      "definition_en": "Cost estimates developed by an outside party to compare with seller proposals and ensure reasonableness.",
      "definition_ar": "تقديرات التكلفة التي يعدها طرف خارجي للمقارنة بعروض البائعين وضمان معقوليتها.",
      "synonyms_en": [
        "should-cost estimates"
      ],
      "synonyms_ar": [
        "تقديرات التكلفة المتوقعة"
      ],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 12.2.2.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/independent-estimates",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/independent-estimates"
    },
    {
      "slug": "influence-impact-grid",
      "term_en": "Influence/Impact Grid",
      "term_ar": "شبكة التأثير/الأثر",
      "abbreviation": null,
      "definition_en": "A stakeholder classification model grouping stakeholders based on their active involvement and ability to effect project outcomes.",
      "definition_ar": "نموذج تصنيف أصحاب المصلحة يجمعهم بناءً على مشاركتهم الفعالة وقدرتهم على التأثير في نتائج المشروع.",
      "synonyms_en": [
        "impact/influence matrix"
      ],
      "synonyms_ar": [
        "مصفوفة التأثير"
      ],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 13.1.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/influence-impact-grid",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/influence-impact-grid"
    },
    {
      "slug": "information-distribution",
      "term_en": "Information Distribution",
      "term_ar": "توزيع المعلومات",
      "abbreviation": null,
      "definition_en": "The process of making relevant information available to project stakeholders in a timely manner.",
      "definition_ar": "عملية إتاحة المعلومات ذات الصلة لأصحاب المصلحة في المشروع في الوقت المناسب.",
      "synonyms_en": [
        "information dissemination"
      ],
      "synonyms_ar": [
        "نشر المعلومات"
      ],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 10.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/information-distribution",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/information-distribution"
    },
    {
      "slug": "inspection",
      "term_en": "Inspection",
      "term_ar": "الفحص",
      "abbreviation": null,
      "definition_en": "A formal examination of a work product to determine whether it conforms to documented standards.",
      "definition_ar": "فحص رسمي لمنتج عمل لتحديد ما إذا كان يتوافق مع المعايير الموثقة.",
      "synonyms_en": [
        "review",
        "walkthrough"
      ],
      "synonyms_ar": [
        "المراجعة"
      ],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 8.3.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/inspection",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/inspection"
    },
    {
      "slug": "integrated-change-control",
      "term_en": "Integrated Change Control",
      "term_ar": "التحكم المتكامل في التغييرات",
      "abbreviation": null,
      "definition_en": "The process of reviewing all change requests; approving changes and managing changes to deliverables, organizational process assets, project documents, and the project management plan.",
      "definition_ar": "عملية مراجعة جميع طلبات التغيير والموافقة على التغييرات وإدارة التغييرات على التسليمات وأصول عمليات المنظمة ووثائق المشروع وخطة إدارة المشروع.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/integrated-change-control",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/integrated-change-control"
    },
    {
      "slug": "issue-log",
      "term_en": "Issue Log",
      "term_ar": "سجل المشكلات",
      "abbreviation": null,
      "definition_en": "A project document used to track and manage issues that need to be resolved for the project to proceed successfully.",
      "definition_ar": "وثيقة مشروع تُستخدم لتتبع وإدارة المشكلات التي يجب حلها لكي يسير المشروع بنجاح.",
      "synonyms_en": [
        "issue register"
      ],
      "synonyms_ar": [
        "سجل القضايا"
      ],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 4.3.3.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/issue-log",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/issue-log"
    },
    {
      "slug": "lag",
      "term_en": "Lag",
      "term_ar": "التأخر",
      "abbreviation": null,
      "definition_en": "The amount of time a successor activity will be delayed with respect to a predecessor activity.",
      "definition_ar": "مقدار الوقت الذي سيتأخر فيه نشاط لاحق بالنسبة لنشاط سابق.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/lag",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/lag"
    },
    {
      "slug": "late-finish",
      "term_en": "Late Finish",
      "term_ar": "النهاية المتأخرة",
      "abbreviation": "LF",
      "definition_en": "The latest possible point in time when the uncompleted portions of a schedule activity can finish without delaying the project finish date.",
      "definition_ar": "آخر نقطة زمنية ممكنة يمكن أن تنتهي فيها الأجزاء غير المكتملة من نشاط الجدولة دون تأخير تاريخ انتهاء المشروع.",
      "synonyms_en": [
        "LF"
      ],
      "synonyms_ar": [
        "النهاية المتأخرة"
      ],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 6.5.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/late-finish",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/late-finish"
    },
    {
      "slug": "late-start",
      "term_en": "Late Start",
      "term_ar": "البداية المتأخرة",
      "abbreviation": "LS",
      "definition_en": "The latest possible point in time when the uncompleted portions of a schedule activity can start without delaying the project finish date.",
      "definition_ar": "آخر نقطة زمنية ممكنة يمكن أن تبدأ فيها الأجزاء غير المكتملة من نشاط الجدولة دون تأخير تاريخ انتهاء المشروع.",
      "synonyms_en": [
        "LS"
      ],
      "synonyms_ar": [
        "البداية المتأخرة"
      ],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 6.5.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/late-start",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/late-start"
    },
    {
      "slug": "lead",
      "term_en": "Lead",
      "term_ar": "السبق",
      "abbreviation": null,
      "definition_en": "The amount of time a successor activity can be advanced with respect to a predecessor activity.",
      "definition_ar": "مقدار الوقت الذي يمكن فيه تقديم نشاط لاحق بالنسبة لنشاط سابق.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/lead",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/lead"
    },
    {
      "slug": "lessons-learned",
      "term_en": "Lessons Learned",
      "term_ar": "الدروس المستفادة",
      "abbreviation": null,
      "definition_en": "The knowledge gained during a project which shows how project events were addressed or should be addressed in the future.",
      "definition_ar": "المعرفة المكتسبة خلال المشروع والتي توضح كيفية معالجة أحداث المشروع أو كيف ينبغي معالجتها في المستقبل.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/lessons-learned",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/lessons-learned"
    },
    {
      "slug": "lessons-learned-register",
      "term_en": "Lessons Learned Register",
      "term_ar": "سجل الدروس المستفادة",
      "abbreviation": null,
      "definition_en": "A project document used to record knowledge gained during a project so that it can be used in the current project and entered into the lessons learned repository.",
      "definition_ar": "وثيقة مشروع تُستخدم لتسجيل المعرفة المكتسبة خلال المشروع لاستخدامها في المشروع الحالي وإدخالها في مستودع الدروس المستفادة.",
      "synonyms_en": [
        "lessons log"
      ],
      "synonyms_ar": [
        "سجل الدروس"
      ],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 4.4.3.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/lessons-learned-register",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/lessons-learned-register"
    },
    {
      "slug": "make-or-buy-analysis",
      "term_en": "Make-or-Buy Analysis",
      "term_ar": "تحليل الصنع أو الشراء",
      "abbreviation": null,
      "definition_en": "A technique used to determine whether work or deliverables can best be accomplished by the project team or should be purchased from outside sources.",
      "definition_ar": "تقنية تُستخدم لتحديد ما إذا كان يمكن إنجاز العمل أو التسليمات بشكل أفضل من قبل فريق المشروع أو شراؤها من مصادر خارجية.",
      "synonyms_en": [
        "outsourcing analysis"
      ],
      "synonyms_ar": [
        "تحليل الاستعانة بمصادر خارجية"
      ],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 12.1.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/make-or-buy-analysis",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/make-or-buy-analysis"
    },
    {
      "slug": "management-reserve",
      "term_en": "Management Reserve",
      "term_ar": "الاحتياطي الإداري",
      "abbreviation": null,
      "definition_en": "An amount of the project budget or project schedule held outside of the performance measurement baseline for management control purposes.",
      "definition_ar": "مبلغ من ميزانية المشروع أو جدول المشروع محجوز خارج خط الأساس لقياس الأداء لأغراض الرقابة الإدارية.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/management-reserve",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/management-reserve"
    },
    {
      "slug": "meeting-management",
      "term_en": "Meeting Management",
      "term_ar": "إدارة الاجتماعات",
      "abbreviation": null,
      "definition_en": "The process of planning, running, and following up on meetings to ensure they are productive and achieve their objectives.",
      "definition_ar": "عملية تخطيط وتشغيل ومتابعة الاجتماعات لضمان كونها منتجة وتحقيق أهدافها.",
      "synonyms_en": [
        "facilitation"
      ],
      "synonyms_ar": [
        "التيسير"
      ],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 10.2.2.6"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/meeting-management",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/meeting-management"
    },
    {
      "slug": "milestone",
      "term_en": "Milestone",
      "term_ar": "المعلم/المرحلة الرئيسية",
      "abbreviation": null,
      "definition_en": "A significant point or event in a project, program, or portfolio.",
      "definition_ar": "نقطة أو حدث مهم في مشروع أو برنامج أو محفظة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/milestone",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/milestone"
    },
    {
      "slug": "milestone-list",
      "term_en": "Milestone List",
      "term_ar": "قائمة المعالم",
      "abbreviation": null,
      "definition_en": "A document identifying all project milestones and indicating whether they are mandatory or optional.",
      "definition_ar": "وثيقة تحدد جميع معالم المشروع وتوضح ما إذا كانت إلزامية أو اختيارية.",
      "synonyms_en": [
        "milestone schedule"
      ],
      "synonyms_ar": [
        "جدولة المعالم"
      ],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 6.2.3.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/milestone-list",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/milestone-list"
    },
    {
      "slug": "monte-carlo-simulation",
      "term_en": "Monte Carlo Simulation",
      "term_ar": "محاكاة مونت كارلو",
      "abbreviation": null,
      "definition_en": "An analysis technique where a computer model is iterated many times to calculate a distribution of possible results.",
      "definition_ar": "تقنية تحليل يتم فيها تكرار نموذج حاسوبي عدة مرات لحساب توزيع النتائج المحتملة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/monte-carlo-simulation",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/monte-carlo-simulation"
    },
    {
      "slug": "negotiation",
      "term_en": "Negotiation",
      "term_ar": "التفاوض",
      "abbreviation": null,
      "definition_en": "A process of discussion and give-and-take among parties to reach a mutually acceptable agreement.",
      "definition_ar": "عملية مناقشة ومبادلة بين الأطراف للوصول إلى اتفاق مقبول للجميع.",
      "synonyms_en": [
        "bargaining"
      ],
      "synonyms_ar": [
        "المساومة"
      ],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 12.2.2.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/negotiation",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/negotiation"
    },
    {
      "slug": "network-path",
      "term_en": "Network Path",
      "term_ar": "مسار الشبكة",
      "abbreviation": null,
      "definition_en": "A series of connected activities in a project schedule network diagram.",
      "definition_ar": "سلسلة من الأنشطة المترابطة في مخطط شبكة جدولة المشروع.",
      "synonyms_en": [
        "path"
      ],
      "synonyms_ar": [
        "المسار"
      ],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 6.5.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/network-path",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/network-path"
    },
    {
      "slug": "networking",
      "term_en": "Networking",
      "term_ar": "التشبيك",
      "abbreviation": null,
      "definition_en": "The process of interacting with others to exchange information and develop professional or social contacts.",
      "definition_ar": "عملية التفاعل مع الآخرين لتبادل المعلومات وتطوير جهات الاتصال المهنية أو الاجتماعية.",
      "synonyms_en": [
        "relationship building"
      ],
      "synonyms_ar": [
        "بناء العلاقات"
      ],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 13.3.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/networking",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/networking"
    },
    {
      "slug": "organizational-process-assets",
      "term_en": "Organizational Process Assets",
      "term_ar": "أصول عمليات المنظمة",
      "abbreviation": null,
      "definition_en": "Plans, processes, policies, procedures, and knowledge bases that are specific to and used by the performing organization.",
      "definition_ar": "الخطط والعمليات والسياسات والإجراءات وقواعد المعرفة الخاصة بالمنظمة المنفذة والمستخدمة من قبلها.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/organizational-process-assets",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/organizational-process-assets"
    },
    {
      "slug": "parametric-estimating",
      "term_en": "Parametric Estimating",
      "term_ar": "التقدير البارامتري",
      "abbreviation": null,
      "definition_en": "An estimating technique that uses a statistical relationship between historical data and other variables to calculate an estimate.",
      "definition_ar": "تقنية تقدير تستخدم علاقة إحصائية بين البيانات التاريخية والمتغيرات الأخرى لحساب التقدير.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/parametric-estimating",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/parametric-estimating"
    },
    {
      "slug": "pareto-chart",
      "term_en": "Pareto Chart",
      "term_ar": "مخطط باريتو",
      "abbreviation": null,
      "definition_en": "A histogram, ordered by frequency of occurrence, that shows how many results were generated by type or category of identified cause.",
      "definition_ar": "مدرج تكراري مرتب حسب تكرار الحدوث يوضح عدد النتائج الناتجة عن كل نوع أو فئة من الأسباب المحددة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/pareto-chart",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/pareto-chart"
    },
    {
      "slug": "performance-reporting",
      "term_en": "Performance Reporting",
      "term_ar": "التقارير عن الأداء",
      "abbreviation": null,
      "definition_en": "The process of collecting and distributing performance information, including status reports and forecasts.",
      "definition_ar": "عملية جمع وتوزيع معلومات الأداء، بما في ذلك تقارير الحالة والتوقعات.",
      "synonyms_en": [
        "status reporting"
      ],
      "synonyms_ar": [
        "تقارير الحالة"
      ],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 10.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/performance-reporting",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/performance-reporting"
    },
    {
      "slug": "phase-gate",
      "term_en": "Phase Gate",
      "term_ar": "بوابة المرحلة",
      "abbreviation": null,
      "definition_en": "A review at the end of a phase to determine whether the project should proceed to the next phase.",
      "definition_ar": "مراجعة في نهاية مرحلة لتحديد ما إذا كان يجب على المشروع الانتقال إلى المرحلة التالية.",
      "synonyms_en": [
        "stage gate",
        "gate review"
      ],
      "synonyms_ar": [
        "بوابة المرحلة",
        "مراجعة البوابة"
      ],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 1.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/phase-gate",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/phase-gate"
    },
    {
      "slug": "planned-value",
      "term_en": "Planned Value",
      "term_ar": "القيمة المخططة",
      "abbreviation": "PV",
      "definition_en": "The authorized budget assigned to scheduled work to be accomplished for a schedule activity or work breakdown structure component.",
      "definition_ar": "الميزانية المعتمدة المخصصة للعمل المجدول لإنجاز نشاط جدولة أو مكون من هيكل تجزئة العمل.",
      "synonyms_en": [
        "PV",
        "budgeted cost of work scheduled"
      ],
      "synonyms_ar": [
        "القيمة المخططة"
      ],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 7.4.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/planned-value",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/planned-value"
    },
    {
      "slug": "political-awareness",
      "term_en": "Political Awareness",
      "term_ar": "الوعي السياسي",
      "abbreviation": null,
      "definition_en": "The understanding of the power dynamics and political environment within and around the project.",
      "definition_ar": "فهم ديناميكيات القوة والبيئة السياسية داخل المشروع وحوله.",
      "synonyms_en": [
        "political acumen"
      ],
      "synonyms_ar": [
        "الحكمة السياسية"
      ],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 3.4.5.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/political-awareness",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/political-awareness"
    },
    {
      "slug": "portfolio",
      "term_en": "Portfolio",
      "term_ar": "المحفظة",
      "abbreviation": null,
      "definition_en": "Projects, programs, subsidiary portfolios, and operations managed as a group to achieve strategic objectives.",
      "definition_ar": "المشاريع والبرامج والمحافظ الفرعية والعمليات التي تُدار كمجموعة لتحقيق الأهداف الاستراتيجية.",
      "synonyms_en": [
        "investment portfolio"
      ],
      "synonyms_ar": [
        "محفظة استثمارات"
      ],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 1.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/portfolio",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/portfolio"
    },
    {
      "slug": "power-interest-grid",
      "term_en": "Power/Interest Grid",
      "term_ar": "شبكة القوة/الاهتمام",
      "abbreviation": null,
      "definition_en": "A classification model used for grouping stakeholders based on their level of authority and their level of concern regarding project outcomes.",
      "definition_ar": "نموذج تصنيف يُستخدم لتجميع أصحاب المصلحة بناءً على مستوى سلطتهم ومستوى اهتمامهم بنتائج المشروع.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/power-interest-grid",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/power-interest-grid"
    },
    {
      "slug": "precedence-diagramming-method",
      "term_en": "Precedence Diagramming Method",
      "term_ar": "طريقة رسم مخطط السبقية",
      "abbreviation": "PDM",
      "definition_en": "A technique used for constructing a schedule model in which activities are represented by nodes and graphically linked by one or more logical relationships.",
      "definition_ar": "تقنية تُستخدم لبناء نموذج جدول زمني يتم فيه تمثيل الأنشطة بالعقد وربطها بيانيًا بعلاقة منطقية واحدة أو أكثر.",
      "synonyms_en": [
        "PDM",
        "activity-on-node"
      ],
      "synonyms_ar": [
        "طريقة السبقية"
      ],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 6.3.2.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/precedence-diagramming-method",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/precedence-diagramming-method"
    },
    {
      "slug": "prevention-cost",
      "term_en": "Prevention Cost",
      "term_ar": "تكلفة الوقاية",
      "abbreviation": null,
      "definition_en": "The cost of activities specifically designed to prevent poor quality in products or services.",
      "definition_ar": "تكلفة الأنشطة المصممة خصيصاً لمنع الجودة الرديئة في المنتجات أو الخدمات.",
      "synonyms_en": [
        "prevention"
      ],
      "synonyms_ar": [
        "الوقاية"
      ],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 8.1.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/prevention-cost",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/prevention-cost"
    },
    {
      "slug": "preventive-action",
      "term_en": "Preventive Action",
      "term_ar": "الإجراء الوقائي",
      "abbreviation": null,
      "definition_en": "An intentional activity that ensures the future performance of the project work is aligned with the project management plan.",
      "definition_ar": "نشاط مقصود يضمن توافق أداء عمل المشروع في المستقبل مع خطة إدارة المشروع.",
      "synonyms_en": [
        "prevention"
      ],
      "synonyms_ar": [
        "الوقاية"
      ],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 4.3.3.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/preventive-action",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/preventive-action"
    },
    {
      "slug": "probability-and-impact-matrix",
      "term_en": "Probability and Impact Matrix",
      "term_ar": "مصفوفة الاحتمالية والتأثير",
      "abbreviation": null,
      "definition_en": "A grid for mapping the probability of each risk occurrence and its impact on project objectives if it does occur.",
      "definition_ar": "شبكة لرسم احتمالية حدوث كل مخاطرة وتأثيرها على أهداف المشروع إذا حدثت.",
      "synonyms_en": [
        "risk matrix"
      ],
      "synonyms_ar": [
        "مصفوفة المخاطر"
      ],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 11.3.2.6"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/probability-and-impact-matrix",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/probability-and-impact-matrix"
    },
    {
      "slug": "procurement-audits",
      "term_en": "Procurement Audits",
      "term_ar": "مراجعات المشتريات",
      "abbreviation": null,
      "definition_en": "A structured review of the procurement process from planning through administering the contract.",
      "definition_ar": "مراجعة منظمة لعملية المشتريات من التخطيط إلى إدارة العقد.",
      "synonyms_en": [
        "procurement review"
      ],
      "synonyms_ar": [
        "مراجعة المشتريات"
      ],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 12.3.2.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/procurement-audits",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/procurement-audits"
    },
    {
      "slug": "procurement-management-plan",
      "term_en": "Procurement Management Plan",
      "term_ar": "خطة إدارة المشتريات",
      "abbreviation": null,
      "definition_en": "A component of the project management plan that describes how a project team will acquire goods and services from outside the performing organization.",
      "definition_ar": "مكون من خطة إدارة المشروع يصف كيفية حصول فريق المشروع على السلع والخدمات من خارج المنظمة المنفذة.",
      "synonyms_en": [
        "procurement plan"
      ],
      "synonyms_ar": [
        "خطة المشتريات"
      ],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 12.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/procurement-management-plan",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/procurement-management-plan"
    },
    {
      "slug": "product-analysis",
      "term_en": "Product Analysis",
      "term_ar": "تحليل المنتج",
      "abbreviation": null,
      "definition_en": "A method for translating high-level product descriptions into tangible deliverable requirements.",
      "definition_ar": "طريقة لترجمة الأوصاف العالية للمنتج إلى متطلبات تسليم ملموسة.",
      "synonyms_en": [
        "requirements analysis"
      ],
      "synonyms_ar": [
        "تحليل المتطلبات"
      ],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 5.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/product-analysis",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/product-analysis"
    },
    {
      "slug": "product-scope",
      "term_en": "Product Scope",
      "term_ar": "نطاق المنتج",
      "abbreviation": null,
      "definition_en": "The features and functions that characterize a product, service, or result.",
      "definition_ar": "الميزات والوظائف التي تميز منتجاً أو خدمة أو نتيجة.",
      "synonyms_en": [
        "product features"
      ],
      "synonyms_ar": [
        "ميزات المنتج"
      ],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 5.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/product-scope",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/product-scope"
    },
    {
      "slug": "program",
      "term_en": "Program",
      "term_ar": "البرنامج",
      "abbreviation": null,
      "definition_en": "A group of related projects, subsidiary programs, and program activities managed in a coordinated way to obtain benefits not available from managing them individually.",
      "definition_ar": "مجموعة من المشاريع ذات الصلة والبرامج الفرعية والأنشطة البرنامجية التي تُدار بطريقة منسقة لتحقيق منافع لا تتوفر عند إدارتها على حدة.",
      "synonyms_en": [
        "programme"
      ],
      "synonyms_ar": [
        "برنامج"
      ],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 1.2.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/program",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/program"
    },
    {
      "slug": "progressive-elaboration",
      "term_en": "Progressive Elaboration",
      "term_ar": "التفصيل التدريجي",
      "abbreviation": null,
      "definition_en": "The iterative process of increasing the level of detail in a project management plan as greater amounts of information and more accurate estimates become available.",
      "definition_ar": "العملية التكرارية لزيادة مستوى التفصيل في خطة إدارة المشروع مع توفر كميات أكبر من المعلومات وتقديرات أكثر دقة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/progressive-elaboration",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/progressive-elaboration"
    },
    {
      "slug": "project",
      "term_en": "Project",
      "term_ar": "المشروع",
      "abbreviation": null,
      "definition_en": "A temporary endeavor undertaken to create a unique product, service, or result.",
      "definition_ar": "مجهود مؤقت يُبذل لإنشاء منتج أو خدمة أو نتيجة فريدة.",
      "synonyms_en": [
        "endeavor",
        "initiative"
      ],
      "synonyms_ar": [
        "مبادرة"
      ],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 1.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project"
    },
    {
      "slug": "project-charter",
      "term_en": "Project Charter",
      "term_ar": "ميثاق المشروع",
      "abbreviation": null,
      "definition_en": "A document issued by the project sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities.",
      "definition_ar": "وثيقة يصدرها راعي المشروع تُصرّح رسمياً بوجود المشروع وتمنح مدير المشروع صلاحية تخصيص موارد المنظمة لأنشطة المشروع.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project-charter",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project-charter"
    },
    {
      "slug": "project-closure",
      "term_en": "Project Closure",
      "term_ar": "إغلاق المشروع",
      "abbreviation": null,
      "definition_en": "The process of finalizing all activities across the project to formally close the project or phase.",
      "definition_ar": "عملية إنهاء جميع الأنشطة عبر المشروع لإغلاق المشروع أو المرحلة رسمياً.",
      "synonyms_en": [
        "close project"
      ],
      "synonyms_ar": [
        "إنهاء المشروع"
      ],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 4.7"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project-closure",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project-closure"
    },
    {
      "slug": "project-life-cycle",
      "term_en": "Project Life Cycle",
      "term_ar": "دورة حياة المشروع",
      "abbreviation": null,
      "definition_en": "The series of phases that a project passes through from its initiation to its closure.",
      "definition_ar": "سلسلة المراحل التي يمر بها المشروع من بدايته إلى إغلاقه.",
      "synonyms_en": [
        "life cycle"
      ],
      "synonyms_ar": [
        "دورة الحياة"
      ],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 1.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project-life-cycle",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project-life-cycle"
    },
    {
      "slug": "project-management-office",
      "term_en": "Project Management Office",
      "term_ar": "مكتب إدارة المشاريع",
      "abbreviation": "PMO",
      "definition_en": "An organizational structure that standardizes the project-related governance processes and facilitates the sharing of resources, methodologies, tools, and techniques.",
      "definition_ar": "هيكل تنظيمي يقيّد عمليات الحوكمة المتعلقة بالمشاريع ويسهل مشاركة الموارد والمنهجيات والأدوات والتقنيات.",
      "synonyms_en": [
        "PMO"
      ],
      "synonyms_ar": [
        "مكتب إدارة المشاريع"
      ],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 2.4.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project-management-office",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project-management-office"
    },
    {
      "slug": "project-management-plan",
      "term_en": "Project Management Plan",
      "term_ar": "خطة إدارة المشروع",
      "abbreviation": null,
      "definition_en": "The document that describes how the project will be executed, monitored and controlled, and closed.",
      "definition_ar": "الوثيقة التي تصف كيفية تنفيذ المشروع ومراقبته والتحكم فيه وإغلاقه.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project-management-plan",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project-management-plan"
    },
    {
      "slug": "project-manager",
      "term_en": "Project Manager",
      "term_ar": "مدير المشروع",
      "abbreviation": "PM",
      "definition_en": "The person assigned by the performing organization to lead the team that is responsible for achieving the project objectives.",
      "definition_ar": "الشخص المعين من قبل المنظمة المنفذة لقيادة الفريق المسؤول عن تحقيق أهداف المشروع.",
      "synonyms_en": [
        "PM"
      ],
      "synonyms_ar": [
        "مدير المشروع"
      ],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 3.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project-manager",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project-manager"
    },
    {
      "slug": "project-organization-chart",
      "term_en": "Project Organization Chart",
      "term_ar": "المخطط التنظيمي للمشروع",
      "abbreviation": null,
      "definition_en": "A graphical representation of the project team members and their reporting relationships.",
      "definition_ar": "تمثيل رسومي لأعضاء فريق المشروع وعلاقات الإبلاغ بينهم.",
      "synonyms_en": [
        "org chart"
      ],
      "synonyms_ar": [
        "الهيكل التنظيمي"
      ],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 9.1.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project-organization-chart",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project-organization-chart"
    },
    {
      "slug": "project-reports",
      "term_en": "Project Reports",
      "term_ar": "تقارير المشروع",
      "abbreviation": null,
      "definition_en": "Formal records that provide information on project status, progress, and performance to stakeholders.",
      "definition_ar": "سجلات رسمية تقدم معلومات عن حالة المشروع وتقدمه وأدائه لأصحاب المصلحة.",
      "synonyms_en": [
        "status reports"
      ],
      "synonyms_ar": [
        "تقارير الحالة"
      ],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 10.2.3.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project-reports",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project-reports"
    },
    {
      "slug": "project-scope",
      "term_en": "Project Scope",
      "term_ar": "نطاق المشروع",
      "abbreviation": null,
      "definition_en": "The work performed to deliver a product, service, or result with the specified features and functions.",
      "definition_ar": "العمل المُنفذ لتسليم منتج أو خدمة أو نتيجة ذات الميزات والوظائف المحددة.",
      "synonyms_en": [
        "scope of work"
      ],
      "synonyms_ar": [
        "نطاق العمل"
      ],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 5.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project-scope",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project-scope"
    },
    {
      "slug": "project-selection",
      "term_en": "Project Selection",
      "term_ar": "اختيار المشروع",
      "abbreviation": null,
      "definition_en": "The process of evaluating and choosing among alternative projects to allocate limited organizational resources.",
      "definition_ar": "عملية تقييم المشاريع البديلة واختيارها لتخصيص الموارد التنظيمية المحدودة.",
      "synonyms_en": [
        "project prioritization"
      ],
      "synonyms_ar": [
        "أولوية المشروع"
      ],
      "category": "integration",
      "knowledge_area": "integration",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 1.2.6"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project-selection",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project-selection"
    },
    {
      "slug": "project-sponsor",
      "term_en": "Project Sponsor",
      "term_ar": "راعي المشروع",
      "abbreviation": null,
      "definition_en": "A senior manager serving as the formal advocate for a project and providing funding, direction, and decision authority.",
      "definition_ar": "مدير تنفيذي يعمل كمؤيد رسمي للمشروع ويوفر التمويل والتوجيه وسلطة اتخاذ القرار.",
      "synonyms_en": [
        "sponsor",
        "executive sponsor"
      ],
      "synonyms_ar": [
        "الراعي التنفيذي"
      ],
      "category": "general",
      "knowledge_area": "general",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 3.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/project-sponsor",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/project-sponsor"
    },
    {
      "slug": "proposal-evaluation-techniques",
      "term_en": "Proposal Evaluation Techniques",
      "term_ar": "تقنيات تقييم العروض",
      "abbreviation": null,
      "definition_en": "A set of approaches used to rate or score seller proposals against predefined criteria.",
      "definition_ar": "مجموعة من الأساليب المستخدمة لتقييم أو تسجيل عروض البائعين مقابل معايير محددة مسبقاً.",
      "synonyms_en": [
        "bid evaluation"
      ],
      "synonyms_ar": [
        "تقييم العطاءات"
      ],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 12.2.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/proposal-evaluation-techniques",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/proposal-evaluation-techniques"
    },
    {
      "slug": "quality-audit",
      "term_en": "Quality Audit",
      "term_ar": "مراجعة الجودة",
      "abbreviation": null,
      "definition_en": "A structured, independent review to determine whether project activities comply with organizational and project policies, processes, and procedures.",
      "definition_ar": "مراجعة منظمة ومستقلة لتحديد ما إذا كانت أنشطة المشروع تتوافق مع سياسات وعمليات وإجراءات المنظمة والمشروع.",
      "synonyms_en": [
        "audit"
      ],
      "synonyms_ar": [
        "المراجعة"
      ],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 8.2.2.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/quality-audit",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/quality-audit"
    },
    {
      "slug": "quality-management-plan",
      "term_en": "Quality Management Plan",
      "term_ar": "خطة إدارة الجودة",
      "abbreviation": null,
      "definition_en": "A component of the project management plan that describes how applicable policies, procedures, and guidelines will be implemented to achieve the quality objectives.",
      "definition_ar": "مكون من خطة إدارة المشروع يصف كيفية تطبيق السياسات والإجراءات والإرشادات المعمول بها لتحقيق أهداف الجودة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/quality-management-plan",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/quality-management-plan"
    },
    {
      "slug": "quality-policy",
      "term_en": "Quality Policy",
      "term_ar": "سياسة الجودة",
      "abbreviation": null,
      "definition_en": "The organization's stated intentions and direction regarding quality as formally expressed by top management.",
      "definition_ar": "نوايا وتوجهات المنظمة بشأن الجودة كما عبّر عنها الإدارة العليا رسمياً.",
      "synonyms_en": [
        "quality mission"
      ],
      "synonyms_ar": [
        "رسالة الجودة"
      ],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMBOK 7, Section 8.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/quality-policy",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/quality-policy"
    },
    {
      "slug": "recognition-and-rewards",
      "term_en": "Recognition and Rewards",
      "term_ar": "التقدير والمكافآت",
      "abbreviation": null,
      "definition_en": "Processes to recognize and reward desirable behavior and performance throughout the project life cycle.",
      "definition_ar": "عمليات للاعتراف بسلوك وأداء مرغوبين ومكافأتهما طوال دورة حياة المشروع.",
      "synonyms_en": [
        "incentives"
      ],
      "synonyms_ar": [
        "الحوافز"
      ],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 9.4.2.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/recognition-and-rewards",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/recognition-and-rewards"
    },
    {
      "slug": "requirements-traceability-matrix",
      "term_en": "Requirements Traceability Matrix",
      "term_ar": "مصفوفة تتبع المتطلبات",
      "abbreviation": null,
      "definition_en": "A grid that links product requirements from their origin to the deliverables that satisfy them.",
      "definition_ar": "شبكة تربط متطلبات المنتج من مصدرها إلى التسليمات التي تلبيها.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/requirements-traceability-matrix",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/requirements-traceability-matrix"
    },
    {
      "slug": "resource-breakdown-structure",
      "term_en": "Resource Breakdown Structure",
      "term_ar": "هيكل تفصيل الموارد",
      "abbreviation": "RBS",
      "definition_en": "A hierarchical representation of resources by category and type used to categorize resources needed for a project.",
      "definition_ar": "تمثيل هرمي للموارد حسب الفئة والنوع يُستخدم لتصنيف الموارد المطلوبة للمشروع.",
      "synonyms_en": [
        "RBS"
      ],
      "synonyms_ar": [
        "هيكل الموارد"
      ],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 9.2.3.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/resource-breakdown-structure",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/resource-breakdown-structure"
    },
    {
      "slug": "resource-leveling",
      "term_en": "Resource Leveling",
      "term_ar": "تسوية الموارد",
      "abbreviation": null,
      "definition_en": "A resource optimization technique in which adjustments are made to the project schedule to optimize the allocation of resources.",
      "definition_ar": "تقنية لتحسين الموارد يتم فيها إجراء تعديلات على جدول المشروع لتحسين توزيع الموارد.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/resource-leveling",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/resource-leveling"
    },
    {
      "slug": "resource-management-plan",
      "term_en": "Resource Management Plan",
      "term_ar": "خطة إدارة الموارد",
      "abbreviation": null,
      "definition_en": "A component of the project management plan that describes how project resources will be categorized, allocated, managed, and released.",
      "definition_ar": "مكون من خطة إدارة المشروع يصف كيفية تصنيف الموارد وتخصيصها وإدارتها وإطلاقها.",
      "synonyms_en": [
        "resource plan"
      ],
      "synonyms_ar": [
        "خطة الموارد"
      ],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 9.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/resource-management-plan",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/resource-management-plan"
    },
    {
      "slug": "resource-requirements",
      "term_en": "Resource Requirements",
      "term_ar": "متطلبات الموارد",
      "abbreviation": null,
      "definition_en": "The types and quantities of resources required for each work package or activity.",
      "definition_ar": "أنواع وكميات الموارد المطلوبة لكل حزمة عمل أو نشاط.",
      "synonyms_en": [
        "resource needs"
      ],
      "synonyms_ar": [
        "احتياجات الموارد"
      ],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 9.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/resource-requirements",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/resource-requirements"
    },
    {
      "slug": "responsibility-assignment-matrix",
      "term_en": "Responsibility Assignment Matrix",
      "term_ar": "مصفوفة تعيين المسؤوليات",
      "abbreviation": "RAM",
      "definition_en": "A grid that shows the project resources assigned to each work package. RACI chart is a common type.",
      "definition_ar": "شبكة توضح موارد المشروع المخصصة لكل حزمة عمل. مخطط RACI هو نوع شائع منها.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/responsibility-assignment-matrix",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/responsibility-assignment-matrix"
    },
    {
      "slug": "risk-appetite",
      "term_en": "Risk Appetite",
      "term_ar": "الرغبة في المخاطرة",
      "abbreviation": null,
      "definition_en": "The degree of uncertainty an organization or individual is willing to accept in anticipation of a reward.",
      "definition_ar": "درجة عدم اليقين التي تكون المنظمة أو الفرد مستعداً لقبولها توقعاً للمكافأة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/risk-appetite",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/risk-appetite"
    },
    {
      "slug": "risk-breakdown-structure",
      "term_en": "Risk Breakdown Structure",
      "term_ar": "هيكل تفصيل المخاطر",
      "abbreviation": "RBS",
      "definition_en": "A hierarchical representation of potential sources of risks, categorized by risk category.",
      "definition_ar": "تمثيل هرمي لمصادر المخاطر المحتملة، مصنفة حسب فئة المخاطر.",
      "synonyms_en": [
        "RBS"
      ],
      "synonyms_ar": [
        "هيكل المخاطر"
      ],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 11.1.3.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/risk-breakdown-structure",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/risk-breakdown-structure"
    },
    {
      "slug": "risk-categorization",
      "term_en": "Risk Categorization",
      "term_ar": "تصنيف المخاطر",
      "abbreviation": null,
      "definition_en": "The process of grouping risks by common characteristics such as source, impact area, or response strategy.",
      "definition_ar": "عملية تجميع المخاطر حسب الخصائص المشتركة مثل المصدر أو مجال التأثير أو استراتيجية الاستجابة.",
      "synonyms_en": [
        "risk classification"
      ],
      "synonyms_ar": [
        "تصنيف المخاطر"
      ],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 11.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/risk-categorization",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/risk-categorization"
    },
    {
      "slug": "risk-impact",
      "term_en": "Risk Impact",
      "term_ar": "تأثير المخاطر",
      "abbreviation": null,
      "definition_en": "The effect on project objectives if a risk event occurs, which can be positive or negative.",
      "definition_ar": "التأثير على أهداف المشروع إذا حدث حدث المخاطر، وقد يكون إيجابياً أو سلباً.",
      "synonyms_en": [
        "consequence"
      ],
      "synonyms_ar": [
        "النتيجة"
      ],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 11.3.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/risk-impact",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/risk-impact"
    },
    {
      "slug": "risk-management-plan",
      "term_en": "Risk Management Plan",
      "term_ar": "خطة إدارة المخاطر",
      "abbreviation": null,
      "definition_en": "A component of the project management plan that describes how risk management activities will be structured and performed.",
      "definition_ar": "مكون من خطة إدارة المشروع يصف كيفية تنظيم وتنفيذ أنشطة إدارة المخاطر.",
      "synonyms_en": [
        "risk plan"
      ],
      "synonyms_ar": [
        "خطة المخاطر"
      ],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 11.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/risk-management-plan",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/risk-management-plan"
    },
    {
      "slug": "risk-owner",
      "term_en": "Risk Owner",
      "term_ar": "مالك المخاطرة",
      "abbreviation": null,
      "definition_en": "The person responsible for monitoring a specific risk and selecting and implementing an appropriate risk response strategy.",
      "definition_ar": "الشخص المسؤول عن مراقبة مخاطرة محددة واختيار وتنفيذ استراتيجية استجابة مناسبة.",
      "synonyms_en": [
        "risk responsible"
      ],
      "synonyms_ar": [
        "المسؤول عن المخاطرة"
      ],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 11.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/risk-owner",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/risk-owner"
    },
    {
      "slug": "risk-probability",
      "term_en": "Risk Probability",
      "term_ar": "احتمالية المخاطر",
      "abbreviation": null,
      "definition_en": "The likelihood that a specific risk event will occur.",
      "definition_ar": "احتمالية حدوث حدث مخاطر محدد.",
      "synonyms_en": [
        "likelihood"
      ],
      "synonyms_ar": [
        "الاحتمال"
      ],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 11.3.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/risk-probability",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/risk-probability"
    },
    {
      "slug": "risk-register",
      "term_en": "Risk Register",
      "term_ar": "سجل المخاطر",
      "abbreviation": null,
      "definition_en": "A repository in which outputs of risk management processes are recorded.",
      "definition_ar": "مستودع يتم فيه تسجيل مخرجات عمليات إدارة المخاطر.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/risk-register",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/risk-register"
    },
    {
      "slug": "risk-response-strategy",
      "term_en": "Risk Response Strategy",
      "term_ar": "استراتيجية الاستجابة للمخاطر",
      "abbreviation": null,
      "definition_en": "The approach that will be used to address an overall or individual project risk, such as avoid, transfer, mitigate, accept, exploit, share, enhance, or escalate.",
      "definition_ar": "النهج الذي سيتم استخدامه للتعامل مع مخاطر المشروع الإجمالية أو الفردية، مثل التجنب أو النقل أو التخفيف أو القبول أو الاستغلال أو المشاركة أو التعزيز أو التصعيد.",
      "synonyms_en": [
        "risk strategy"
      ],
      "synonyms_ar": [
        "استراتيجية المخاطر"
      ],
      "category": "risk",
      "knowledge_area": "risk",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 11.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/risk-response-strategy",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/risk-response-strategy"
    },
    {
      "slug": "rolling-wave-planning",
      "term_en": "Rolling Wave Planning",
      "term_ar": "التخطيط الموجي المتجدد",
      "abbreviation": null,
      "definition_en": "An iterative planning technique in which the work to be accomplished in the near term is planned in detail.",
      "definition_ar": "تقنية تخطيط تكرارية يتم فيها التخطيط التفصيلي للعمل الذي سيُنجز على المدى القريب.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/rolling-wave-planning",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/rolling-wave-planning"
    },
    {
      "slug": "salience-model",
      "term_en": "Salience Model",
      "term_ar": "نموذج البروز",
      "abbreviation": null,
      "definition_en": "A classification model used to identify stakeholders based on their power, urgency, and legitimacy.",
      "definition_ar": "نموذج تصنيف يُستخدم لتحديد أصحاب المصلحة بناءً على قوتهم وإلحاحهم وشرعيتهم.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/salience-model",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/salience-model"
    },
    {
      "slug": "schedule-performance-index",
      "term_en": "Schedule Performance Index",
      "term_ar": "مؤشر أداء الجدول الزمني",
      "abbreviation": "SPI",
      "definition_en": "A measure of schedule efficiency expressed as the ratio of earned value to planned value.",
      "definition_ar": "مقياس لكفاءة الجدول الزمني يُعبّر عنه بنسبة القيمة المكتسبة إلى القيمة المخططة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/schedule-performance-index",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/schedule-performance-index"
    },
    {
      "slug": "schedule-variance",
      "term_en": "Schedule Variance",
      "term_ar": "تباين الجدول الزمني",
      "abbreviation": "SV",
      "definition_en": "A measure of schedule performance expressed as the difference between the earned value and the planned value.",
      "definition_ar": "مقياس أداء الجدول الزمني يُعبّر عنه بالفرق بين القيمة المكتسبة والقيمة المخططة.",
      "synonyms_en": [
        "SV"
      ],
      "synonyms_ar": [
        "تباين الجدول"
      ],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 7.4.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/schedule-variance",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/schedule-variance"
    },
    {
      "slug": "scope-baseline",
      "term_en": "Scope Baseline",
      "term_ar": "خط الأساس للنطاق",
      "abbreviation": null,
      "definition_en": "The approved version of a scope statement, work breakdown structure (WBS), and its associated WBS dictionary.",
      "definition_ar": "النسخة المعتمدة من بيان النطاق وهيكل تجزئة العمل (WBS) وقاموس هيكل تجزئة العمل المرتبط به.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/scope-baseline",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/scope-baseline"
    },
    {
      "slug": "scope-creep",
      "term_en": "Scope Creep",
      "term_ar": "زحف النطاق",
      "abbreviation": null,
      "definition_en": "The uncontrolled expansion to product or project scope without adjustments to time, cost, and resources.",
      "definition_ar": "التوسع غير المسيطر عليه في نطاق المنتج أو المشروع دون تعديلات على الوقت والتكلفة والموارد.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/scope-creep",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/scope-creep"
    },
    {
      "slug": "scope-statement",
      "term_en": "Scope Statement",
      "term_ar": "بيان النطاق",
      "abbreviation": null,
      "definition_en": "A narrative description of the project scope, major deliverables, assumptions, and constraints.",
      "definition_ar": "وصف سردي لنطاق المشروع والتسليمات الرئيسية والافتراضات والقيود.",
      "synonyms_en": [
        "project scope statement"
      ],
      "synonyms_ar": [
        "بيان نطاق المشروع"
      ],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 5.3.3.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/scope-statement",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/scope-statement"
    },
    {
      "slug": "source-selection-criteria",
      "term_en": "Source Selection Criteria",
      "term_ar": "معايير اختيار المصدر",
      "abbreviation": null,
      "definition_en": "A set of attributes desired by the buyer and used to rate or score seller proposals.",
      "definition_ar": "مجموعة من السمات التي يرغب فيها المشتري وتُستخدم لتقييم أو تسجيل عروض البائعين.",
      "synonyms_en": [
        "evaluation criteria"
      ],
      "synonyms_ar": [
        "معايير التقييم"
      ],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 12.1.3.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/source-selection-criteria",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/source-selection-criteria"
    },
    {
      "slug": "stakeholder-analysis",
      "term_en": "Stakeholder Analysis",
      "term_ar": "تحليل أصحاب المصلحة",
      "abbreviation": null,
      "definition_en": "A technique of systematically gathering and analyzing quantitative and qualitative information to determine whose interests should be taken into account.",
      "definition_ar": "تقنية لجمع وتحليل المعلومات الكمية والنوعية بشكل منهجي لتحديد المصالح التي يجب مراعاتها.",
      "synonyms_en": [
        "stakeholder mapping"
      ],
      "synonyms_ar": [
        "رسم خريطة أصحاب المصلحة"
      ],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 13.1.2.3"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/stakeholder-analysis",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/stakeholder-analysis"
    },
    {
      "slug": "stakeholder-cube",
      "term_en": "Stakeholder Cube",
      "term_ar": "مكعب أصحاب المصلحة",
      "abbreviation": null,
      "definition_en": "A three-dimensional model that combines multiple stakeholder classification methods into a single representation.",
      "definition_ar": "نموذج ثلاثي الأبعاد يجمع بين عدة طرق لتصنيف أصحاب المصلحة في تمثيل واحد.",
      "synonyms_en": [
        "stakeholder 3D model"
      ],
      "synonyms_ar": [
        "النموذج ثلاثي الأبعاد لأصحاب المصلحة"
      ],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 13.1.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/stakeholder-cube",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/stakeholder-cube"
    },
    {
      "slug": "stakeholder-engagement-assessment-matrix",
      "term_en": "Stakeholder Engagement Assessment Matrix",
      "term_ar": "مصفوفة تقييم إشراك أصحاب المصلحة",
      "abbreviation": null,
      "definition_en": "A matrix that compares current and desired stakeholder engagement levels to identify gaps and guide engagement strategies.",
      "definition_ar": "مصفوفة تقارن بين مستويات إشراك أصحاب المصلحة الحالية والمرغوبة لتحديد الفجوات وتوجيه استراتيجيات الإشراك.",
      "synonyms_en": [
        "engagement matrix"
      ],
      "synonyms_ar": [
        "مصفوفة الإشراك"
      ],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 13.2.2.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/stakeholder-engagement-assessment-matrix",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/stakeholder-engagement-assessment-matrix"
    },
    {
      "slug": "stakeholder-engagement-plan",
      "term_en": "Stakeholder Engagement Plan",
      "term_ar": "خطة إشراك أصحاب المصلحة",
      "abbreviation": null,
      "definition_en": "A component of the project management plan that identifies the strategies and actions required to promote productive involvement of stakeholders.",
      "definition_ar": "مكون من خطة إدارة المشروع يحدد الاستراتيجيات والإجراءات المطلوبة لتعزيز المشاركة المثمرة لأصحاب المصلحة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "stakeholder",
      "knowledge_area": "stakeholder",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/stakeholder-engagement-plan",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/stakeholder-engagement-plan"
    },
    {
      "slug": "stakeholder-register",
      "term_en": "Stakeholder Register",
      "term_ar": "سجل أصحاب المصلحة",
      "abbreviation": null,
      "definition_en": "A project document including the identification, assessment, and classification of project stakeholders.",
      "definition_ar": "وثيقة مشروع تتضمن تحديد وتقييم وتصنيف أصحاب المصلحة في المشروع.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "communications",
      "knowledge_area": "communications",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/stakeholder-register",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/stakeholder-register"
    },
    {
      "slug": "statement-of-work",
      "term_en": "Statement of Work",
      "term_ar": "بيان العمل",
      "abbreviation": "SOW",
      "definition_en": "A narrative description of products, services, or results to be delivered by the project.",
      "definition_ar": "وصف سردي للمنتجات أو الخدمات أو النتائج التي سيسلمها المشروع.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/statement-of-work",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/statement-of-work"
    },
    {
      "slug": "statistical-sampling",
      "term_en": "Statistical Sampling",
      "term_ar": "العينة الإحصائية",
      "abbreviation": null,
      "definition_en": "The selection of a subset from a population to estimate characteristics of the whole population.",
      "definition_ar": "اختيار جزء من مجموعة لتقدير خصائص المجموعة بأكملها.",
      "synonyms_en": [
        "sampling"
      ],
      "synonyms_ar": [
        "أخذ العينات"
      ],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 8.3.2.6"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/statistical-sampling",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/statistical-sampling"
    },
    {
      "slug": "team-charter",
      "term_en": "Team Charter",
      "term_ar": "ميثاق الفريق",
      "abbreviation": null,
      "definition_en": "A document that establishes the team values, agreements, and operating guidelines for the team.",
      "definition_ar": "وثيقة تحدد قيم الفريق والاتفاقيات والمبادئ التوجيهية التشغيلية للفريق.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/team-charter",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/team-charter"
    },
    {
      "slug": "team-performance-assessments",
      "term_en": "Team Performance Assessments",
      "term_ar": "تقييمات أداء الفريق",
      "abbreviation": null,
      "definition_en": "Evaluations of the project team's effectiveness as a team and the performance of individual team members.",
      "definition_ar": "تقييمات لفعالية فريق المشروع كفريق ولأداء الأعضاء الأفراد.",
      "synonyms_en": [
        "performance reviews"
      ],
      "synonyms_ar": [
        "مراجعات الأداء"
      ],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 9.4.3.1"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/team-performance-assessments",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/team-performance-assessments"
    },
    {
      "slug": "testing",
      "term_en": "Testing",
      "term_ar": "الاختبار",
      "abbreviation": null,
      "definition_en": "An organized and constructed investigation conducted to provide objective information about the quality of a product.",
      "definition_ar": "تحقيق منظم ومبرمج يُجرى لتوفير معلومات موضوعية حول جودة منتج.",
      "synonyms_en": [
        "product testing"
      ],
      "synonyms_ar": [
        "اختبار المنتج"
      ],
      "category": "quality",
      "knowledge_area": "quality",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 8.3.2.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/testing",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/testing"
    },
    {
      "slug": "three-point-estimating",
      "term_en": "Three-Point Estimating",
      "term_ar": "التقدير ثلاثي النقاط",
      "abbreviation": null,
      "definition_en": "A technique used to estimate cost or duration by applying an average or weighted average of optimistic, pessimistic, and most likely estimates.",
      "definition_ar": "تقنية تُستخدم لتقدير التكلفة أو المدة بتطبيق متوسط أو متوسط مرجح للتقديرات المتفائلة والمتشائمة والأكثر احتمالاً.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/three-point-estimating",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/three-point-estimating"
    },
    {
      "slug": "time-and-material-contract",
      "term_en": "Time and Material Contract",
      "term_ar": "عقد الوقت والمواد",
      "abbreviation": null,
      "definition_en": "A type of contract that is a hybrid arrangement containing aspects of both cost-reimbursable and fixed-price contracts.",
      "definition_ar": "نوع من العقود يمثل ترتيباً مختلطاً يحتوي على جوانب من عقود استرداد التكاليف وعقود السعر الثابت.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "procurement",
      "knowledge_area": "procurement",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/time-and-material-contract",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/time-and-material-contract"
    },
    {
      "slug": "to-complete-performance-index",
      "term_en": "To-Complete Performance Index",
      "term_ar": "مؤشر أداء الإتمام",
      "abbreviation": "TCPI",
      "definition_en": "A measure of the cost performance that must be achieved with the remaining resources in order to meet a specified management goal.",
      "definition_ar": "مقياس لأداء التكلفة الذي يجب تحقيقه بالموارد المتبقية من أجل تحقيق هدف إداري محدد.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/to-complete-performance-index",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/to-complete-performance-index"
    },
    {
      "slug": "total-float",
      "term_en": "Total Float",
      "term_ar": "الوقت العائم الكلي",
      "abbreviation": null,
      "definition_en": "The amount of time that a schedule activity can be delayed from its early start date without delaying the project finish date or violating a schedule constraint.",
      "definition_ar": "مقدار الوقت الذي يمكن تأخير نشاط الجدولة من تاريخ بدايته المبكر دون تأخير تاريخ انتهاء المشروع أو انتهاك قيد الجدولة.",
      "synonyms_en": [
        "total slack"
      ],
      "synonyms_ar": [
        "المرونة الكلية"
      ],
      "category": "schedule",
      "knowledge_area": "schedule",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 6.5.2.2"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/total-float",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/total-float"
    },
    {
      "slug": "training",
      "term_en": "Training",
      "term_ar": "التدريب",
      "abbreviation": null,
      "definition_en": "Activities designed to enhance the competencies of team members and stakeholders.",
      "definition_ar": "أنشطة مصممة لتعزيز كفاءات أعضاء الفريق وأصحاب المصلحة.",
      "synonyms_en": [
        "capability building"
      ],
      "synonyms_ar": [
        "بناء القدرات"
      ],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7",
        "ECO 2026"
      ],
      "source_refs": [
        "PMBOK 7, Section 9.4.2.6"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/training",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/training"
    },
    {
      "slug": "validate-scope",
      "term_en": "Validate Scope",
      "term_ar": "التحقق من صحة النطاق",
      "abbreviation": null,
      "definition_en": "The process of formalizing acceptance of the completed project deliverables.",
      "definition_ar": "عملية إضفاء الطابع الرسمي على قبول تسليمات المشروع المكتملة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/validate-scope",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/validate-scope"
    },
    {
      "slug": "variance-at-completion",
      "term_en": "Variance at Completion",
      "term_ar": "التباين عند الاكتمال",
      "abbreviation": "VAC",
      "definition_en": "A projection of the amount of budget deficit or surplus, expressed as the difference between the budget at completion and the estimate at completion.",
      "definition_ar": "توقع لمقدار العجز أو الفائض في الميزانية، يُعبّر عنه بالفرق بين الميزانية عند الاكتمال والتقدير عند الاكتمال.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "cost",
      "knowledge_area": "cost",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/variance-at-completion",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/variance-at-completion"
    },
    {
      "slug": "verified-deliverable",
      "term_en": "Verified Deliverable",
      "term_ar": "التسليم المتحقق منه",
      "abbreviation": null,
      "definition_en": "A project deliverable that has been checked and confirmed for correctness through the Control Quality process.",
      "definition_ar": "تسليم مشروع تم التحقق منه وتأكيد صحته من خلال عملية مراقبة الجودة.",
      "synonyms_en": [
        "inspected deliverable"
      ],
      "synonyms_ar": [
        "تسليم مفحوص"
      ],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 5.5"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/verified-deliverable",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/verified-deliverable"
    },
    {
      "slug": "virtual-team",
      "term_en": "Virtual Team",
      "term_ar": "الفريق الافتراضي",
      "abbreviation": null,
      "definition_en": "A group of people with a shared goal who fulfill their roles with little or no time spent meeting face to face.",
      "definition_ar": "مجموعة من الأشخاص لديهم هدف مشترك يؤدون أدوارهم مع قضاء وقت قليل أو معدوم في الاجتماعات وجهاً لوجه.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "resource",
      "knowledge_area": "resource",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/virtual-team",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/virtual-team"
    },
    {
      "slug": "wbs-dictionary",
      "term_en": "WBS Dictionary",
      "term_ar": "قاموس هيكل تجزئة العمل",
      "abbreviation": null,
      "definition_en": "A document that provides detailed deliverable, activity, and scheduling information about each component in the work breakdown structure.",
      "definition_ar": "وثيقة توفر معلومات تفصيلية عن التسليمات والأنشطة والجدولة لكل مكون في هيكل تجزئة العمل.",
      "synonyms_en": [
        "WBS detail"
      ],
      "synonyms_ar": [
        "تفاصيل هيكل تجزئة العمل"
      ],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "PMBOK 7"
      ],
      "source_refs": [
        "PMBOK 7, Section 5.4"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/wbs-dictionary",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/wbs-dictionary"
    },
    {
      "slug": "work-breakdown-structure",
      "term_en": "Work Breakdown Structure",
      "term_ar": "هيكل تجزئة العمل",
      "abbreviation": "WBS",
      "definition_en": "A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables.",
      "definition_ar": "تقسيم هرمي للنطاق الكلي للعمل الذي سينفذه فريق المشروع لتحقيق أهداف المشروع وإنشاء التسليمات المطلوبة.",
      "synonyms_en": [],
      "synonyms_ar": [],
      "category": "scope",
      "knowledge_area": "scope",
      "eco_domain": null,
      "eco_tasks": [],
      "pmbok7_domain": null,
      "approach": null,
      "variants": {},
      "related_terms": [],
      "standards": [
        "ECO 2026",
        "PMBOK 7",
        "ISO 21502"
      ],
      "source_refs": [
        "PMI, PMP Examination Content Outline (2026)",
        "PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition",
        "ISO 21502:2020, Project, programme and portfolio management — Guidance on project management"
      ],
      "notes_en": null,
      "notes_ar": null,
      "version": 1,
      "updated": "2026-08-30",
      "url_en": "https://lexicon.bayhaspm.com/en/terms/work-breakdown-structure",
      "url_ar": "https://lexicon.bayhaspm.com/ar/terms/work-breakdown-structure"
    }
  ]
}