Variance at Completion(VAC)

التباين عند الاكتمال

ECO 2026 — standardPMBOK 7 — standardISO 21502 — standardv1 · 2026-08-30العربية

English

Variance at Completion (VAC)

A projection of the amount of budget deficit or surplus, expressed as the difference between the budget at completion and the estimate at completion.

العربية

التباين عند الاكتمال

توقع لمقدار العجز أو الفائض في الميزانية، يُعبّر عنه بالفرق بين الميزانية عند الاكتمال والتقدير عند الاكتمال.

Category

Cost

Standards

  • ECO 2026 — PMP Examination Content Outline 2026
  • PMBOK 7 — PMBOK Guide, 7th Edition
  • ISO 21502 — ISO 21502:2020

Source references

  • PMI, PMP Examination Content Outline (2026)
  • PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition
  • ISO 21502:2020, Project, programme and portfolio management — Guidance on project management

Cite as

EnglishAl-Sawady, B. (2026). Variance at Completion. Bayhas PM Lexicon, v1. Retrieved 2026-10-29 from https://lexicon.bayhaspm.com/en/terms/variance-at-completion

العربيةالسوادي، ب. (2026). التباين عند الاكتمال. معجم بيهس لإدارة المشاريع، الإصدار 1. تم الاطلاع في 2026-10-29 من https://lexicon.bayhaspm.com/ar/terms/variance-at-completion

CC BY 4.0·This lexicon is licensed under Creative Commons Attribution 4.0. Reuse is permitted, including commercially, as long as you credit Bayhas Al Sawady and link back.

Version date: