Schedule Variance(SV)
تباين الجدول الزمني
English
Schedule Variance (SV)
A measure of schedule performance expressed as the difference between the earned value and the planned value.
Synonyms: SV
العربية
تباين الجدول الزمني
مقياس أداء الجدول الزمني يُعبّر عنه بالفرق بين القيمة المكتسبة والقيمة المخططة.
المرادفات: تباين الجدول
Category
Cost
Standards
- PMBOK 7 — PMBOK Guide, 7th Edition
- ECO 2026 — PMP Examination Content Outline 2026
Source references
- PMBOK 7, Section 7.4.2.2
Cite as
EnglishAl-Sawady, B. (2026). Schedule Variance. Bayhas PM Lexicon, v1. Retrieved 2026-10-29 from https://lexicon.bayhaspm.com/en/terms/schedule-variance
العربيةالسوادي، ب. (2026). تباين الجدول الزمني. معجم بيهس لإدارة المشاريع، الإصدار 1. تم الاطلاع في 2026-10-29 من https://lexicon.bayhaspm.com/ar/terms/schedule-variance
CC BY 4.0·This lexicon is licensed under Creative Commons Attribution 4.0. Reuse is permitted, including commercially, as long as you credit Bayhas Al Sawady and link back.