Fast Tracking

التتبع السريع

ECO 2026 — standardPMBOK 7 — standardISO 21502 — standardv1 · 2026-08-30العربية

English

Fast Tracking

A schedule compression technique in which activities or phases normally done in sequence are performed in parallel for at least a portion of their duration.

العربية

التتبع السريع

تقنية ضغط الجدول الزمني يتم فيها تنفيذ الأنشطة أو المراحل التي تُنفذ عادةً بالتتابع بشكل متوازٍ لجزء على الأقل من مدتها.

Category

Schedule

Standards

  • ECO 2026 — PMP Examination Content Outline 2026
  • PMBOK 7 — PMBOK Guide, 7th Edition
  • ISO 21502 — ISO 21502:2020

Source references

  • PMI, PMP Examination Content Outline (2026)
  • PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition
  • ISO 21502:2020, Project, programme and portfolio management — Guidance on project management

Cite as

EnglishAl-Sawady, B. (2026). Fast Tracking. Bayhas PM Lexicon, v1. Retrieved 2026-10-29 from https://lexicon.bayhaspm.com/en/terms/fast-tracking

العربيةالسوادي، ب. (2026). التتبع السريع. معجم بيهس لإدارة المشاريع، الإصدار 1. تم الاطلاع في 2026-10-29 من https://lexicon.bayhaspm.com/ar/terms/fast-tracking

CC BY 4.0·This lexicon is licensed under Creative Commons Attribution 4.0. Reuse is permitted, including commercially, as long as you credit Bayhas Al Sawady and link back.

Version date: