Earned Value Management(EVM)

إدارة القيمة المكتسبة

ECO 2026 — standardPMBOK 7 — standardISO 21502 — standardv1 · 2026-08-30العربية

English

Earned Value Management (EVM)

A methodology that combines scope, schedule, and resource measurements to assess project performance and progress.

العربية

إدارة القيمة المكتسبة

منهجية تجمع بين قياسات النطاق والجدول الزمني والموارد لتقييم أداء المشروع وتقدمه.

Category

Cost

Standards

  • ECO 2026 — PMP Examination Content Outline 2026
  • PMBOK 7 — PMBOK Guide, 7th Edition
  • ISO 21502 — ISO 21502:2020

Source references

  • PMI, PMP Examination Content Outline (2026)
  • PMI, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th Edition
  • ISO 21502:2020, Project, programme and portfolio management — Guidance on project management

Cite as

EnglishAl-Sawady, B. (2026). Earned Value Management. Bayhas PM Lexicon, v1. Retrieved 2026-10-29 from https://lexicon.bayhaspm.com/en/terms/earned-value-management

العربيةالسوادي، ب. (2026). إدارة القيمة المكتسبة. معجم بيهس لإدارة المشاريع، الإصدار 1. تم الاطلاع في 2026-10-29 من https://lexicon.bayhaspm.com/ar/terms/earned-value-management

CC BY 4.0·This lexicon is licensed under Creative Commons Attribution 4.0. Reuse is permitted, including commercially, as long as you credit Bayhas Al Sawady and link back.

Version date: